![Power Sensors Limited PQube 3 Instruction Manual Download Page 23](http://html.mh-extra.com/html/power-sensors-limited/pqube-3/pqube-3_instruction-manual_1587634023.webp)
PQube 3 Instruction Manual
Page 23 of 103
PQube 3
PM1
PQube 3
PM1
UPS1
3.1.8
Protect antenna terminals from lightning
If you install an antenna in an outdoor location where it may be exposed to lightning, you must
include a properly installed UL-497C-listed lightning protection device on the antenna cable and
the antenna must be reliably earthed. Follow all local installation safety requirements and
regulations.
3.1.9
Installing Your PM1 Power Supply Module
The optional PM1 Power Supply Module connects to the right side of your PQube 3; just snap it in.
It accepts any 50/60/400 Hz single-phase input between 100Vac and 240Vac nominal. Verify that
you are connecting the line and neutral wires to the correct terminals on the module.
3.1.10
Installing Your UPS Module
The UPS Module provides backup power to your PQube 3 in the event of complete loss of
instrument power. Plug it into the right-side of your PQube 3. If using a PM1 Power Supply
Module, plug the UPS module into the right side of the PM1 module. The lithium-ion battery pack
can provide power between 1 and 30 minutes (user-configurable).
Shop for Power Metering products online at:
1.877.766.5412
www.
PowerMeterStore
.ca