Powered by Safety
®
iv
PowlVac® ASD 27kV & 38kV Vacuum Circuit Breaker
IB-65100
Figures
Tables
Table A Field Dielectric Test Values ..........................................................................................................25
Table B Lubrication ..................................................................................................................................36
Table C Timing ..........................................................................................................................................46
Table D Primary Resistance .....................................................................................................................46
Table E Primary Current Path ..................................................................................................................51
Table F Control Devices ............................................................................................................................52
Table G Miscellaneous Parts ....................................................................................................................54
Figure 1
Front View of PowlVac® ASD Circuit Breaker with Cover ....................................................7
Figure 2
Rear View of PowlVac® ASD Circuit Breaker ........................................................................8
Figure 3
PowlVac® ASD Circuit Breaker Compartment .....................................................................9
Figure 4
Operating Pushrod Assembly of PowlVac® 38kV ASD Circuit Breaker .............................10
Figure 5
Ground Connection of PowlVac® ASD 38kV Circuit Breaker ............................................10
Figure 6
Front View of PowlVac® ASD Circuit Breaker without Cover ............................................12
Figure 7
Close-Up Front View of PowlVac® ASD Circuit Breaker Mechanism .................................13
Figure 8
Cam and Fundamental Linkage Positions ........................................................................14
Figure 9
Mechanical and Trip Linkages ...........................................................................................15
Figure 10
Typical Control Scheme .....................................................................................................18
Figure 11
Test Plug Jumper Interlock ................................................................................................20
Figure 12
Secondary Disconnect Receptacle and Secondary Disconnect Device Completed .........20
Figure 13
Lifting the Circuit Breaker by Crane ..................................................................................23
Figure 14
Push to Trip Knob & Racking Access Door .........................................................................28
Figure 15
Racking Indicator Flags & Racking Handle .......................................................................28
Figure 16
Lubrication ........................................................................................................................34
Figure 17
Lubrication (cont) ..............................................................................................................35
Figure 18
Main Closing Spring AssemblyCompressed for Removal .................................................37
Figure 19
Main Closing Spring AssemblyInstalled ...........................................................................37
Figure 20
Primary & Secondary Trip Prop Adjustment .....................................................................39
Figure 21
Feeler Gauge ......................................................................................................................40
Figure 22
Trip Armature Assembly Left View ....................................................................................41
Figure 23
Trip Armature Assembly Right View .................................................................................42
Figure 24
Circuit Breaker Trip Roller .................................................................................................42
Figure 25
Latch Check Switch Adjustment ........................................................................................43
Figure 26
Vacuum Interrupter Assembly Drawing (38kV, 1200A) ....................................................50
Figure 27
Primary Current Path ........................................................................................................51
Figure 28
Control Devices ..................................................................................................................53