![Pony GOLIATH 50 Installation, Use And Maintenance Manual Download Page 4](http://html1.mh-extra.com/html/pony/goliath-50/goliath-50_installation-use-and-maintenance-manual_1579311004.webp)
i:\gestione istruzione\_generatori\ge50-65-90 norme ped\aggiornamento\4ge50-65-90_en-agg.doc (marzo 01)
I N D E X
CHAPTER 1..................................................1-1
PRESCRIPTION, DANGER AND
INDICATION SIGNALS................................1-1
CHAPTER 2..................................................2-1
MACHINE IDENTIFICATION....................2-1
CHAPTER 4 ....................................................... 4-1
SAFETY WARNINGS ....................................... 4-1
USE ........................................................................... 4-1
GENERAL ................................................................ 4-1
SITE .......................................................................... 4-1
ELECTRICAL .......................................................... 4-1
DANGER OF BURNS ............................................. 4-2
BOILER .................................................................... 4-2
SERVICE DEVICE .................................................. 4-2
SAFETY DEVICE .................................................... 4-2
RESIDUAL RISK ............................................... 4-3
INSTALLATION PROCEDURES ................... 4-3
PACKING ................................................................. 4-3
UNPACKING AND LAYING OF THE STEAM
GENERATOR .......................................................... 4-3
WATER AND DISCHARGE CONNECTION ........ 4-3
ELECTRICAL CONNECTION ............................... 4-3
STEAM AND CONDENSATES RETURN
CONNECTION TO THE SERVICE AND SAFETY
DEVICES ................................................................. 4-4
BOILER WASHING ................................................ 4-4
PROCEDURES FOR USING THE STEAM
GENERATOR ..................................................... 4-4
PRELIMINARY CONTROLS ................................. 4-4
START-UP OF ......................................................... 4-4
THE STEAM GENERATOR ................................... 4-4
OPERATION OF THE ELECTRONIC LEVEL
CONTROL FOR CONDENSATE RECOVERY
TANK (IF EQUIPPED) ............................................ 4-4
OPERATION OF THE ELECTRONIC LEVEL
CONTROL FOR BOILER........................................ 4-5
OPERATION OF THE THERMOREGULATOR
CONDENSATE RECOVERY TANK (IF
EQUIPPED) .............................................................. 4-5
SAFETIES OPERATION CONCERNING OVER-
PRESSURE AND OVER-TEMPERATURE ........... 4-5
PROCEDURES TO COMPLETE SHUTTING
DOWN OF THE MACHINE ............................. 4-5
MAINTENANCE PROCEDURES .................... 4-5
WEEKLY MAINTENANCE .................................... 4-5
SIX MONTHLY / YEARLY MAINTENANCE ...... 4-6
INSPECTION PROCEDURES ......................... 4-6
BREAKDOWNS ................................................. 4-6
IMMEDIATELY FOLLOWING INSTALLATION. 4-6
BREAKDOWNS ON THE BOILER AND ON THE
ELECTRONIC LEVEL CONTROL ......................... 4-6
BREAKDOWNS ON THE CONDENSATE
RECOVER TANK AND ON THE ELECTRONIC
LEVEL CONTROL (IF EQUIPPED) ....................... 4-7
BOILER HEATING ELEMENT BURNT OUT ....... 4-8
ORDERING SPARE PARTS ............................. 4-8
STORAGE OR DEMOLITION PROCEDURES4-8
TECHNICAL SECTION
(
SPARE PARTS AND DRAWINGS)
EN