Before placing the pump into operation the operator must make sure that
• the pump and all other components were not damaged during the
carriage.
• the information on the nameplate concerning equipment group and
category, zone, temperature class and explosion group accords with
the permissible use in the particular hazardous location.
• the air temperature of the ambience of the pump is observed.
• the maximum temperature of the pumping media is not exceeded.
• +60°C continuous operation
• +80°C short-time operation (operating time max. 1 h)
• pump hose, clamping rings and connecting sockets are mounted
properly and the pump hose is greased sufficiently with Ponndorf
special grease (as described in chapter 6.4).
In case of any discrepancies the pump must not be placed into operation!
While placing the pump into operation the characteristics (pump speed, pressure) which are
prescribed in the manual and on the nameplate must not be exceeded.
3.4
Qualification and training of personnel
The technical personnel responsible for operation, maintenance, inspection and installation
must be qualified for this work. Fields of responsibility, competencies and the supervision of
the personnel have to be exactly regulated by the operator. If the personnel is inadequately
skilled it must be trained and instructed. If necessary, this may be effected by order of the
operator by the manufacturer/supplier.
Furthermore the operator has to make sure that the personnel did absolutely catch the
contents of the operation manual.
3.5
Dangers in case of non-observance of the safety instructions
Non-observance of the safety instructions can endanger people, environment and
equipment and can result in losing any claim for damages.
Summary of Contents for P delta 15
Page 1: ...Hose Pump Series P_delta PD S Operation Manual...
Page 2: ......