35
covers
Conduit
All conduits are tightly installed and sealed.
Wire protection
Insulated cover of wires are not at risk of being cut or
damaged.
Basic Operations
Boot System
WARNING: Proceed to the following steps only after installation checklist is
completed.
(1)
Switch on the POWER switch on the BCMS module, press START button for 1s
and release, wait around 60 seconds until the BCMS and Battery Modules start
normally, and
(2)
Switch on the PV SWITCH on the Universal PCS, and
(3)
Press the ON/OFF button on Universal PCS, wait around 60 seconds until the
system starts normally, and
(4)
Switch on the AC SWITCH on Universal PCS.
NOTE: When the system starts working properly, put the door of battery system
back to the cabinet. Lock it and keep the key well.
Shut Down System
WARNING: Shut down the device and switch off all the external switches
from the home electrical panel for maintenance or extended period of non-
use.
(1)
Press the ON/OFF button on Universal PCS, and
(2)
Switch off the POWER switch on the BCMS module
(3)
Switch off the PV SWITCH on the Universal PCS, and
(4)
Switch off the AC SWITCH on Universal PCS.
Summary of Contents for iCAN NetZero Plus
Page 1: ...iCAN NetZero Plus User Manual V1 0 0 ...
Page 2: ......
Page 4: ...Service 7 ...
Page 13: ...9 Network Indicator Power Indicator Wiring Box Sealed Cap Run Indicator Status Indicator ...
Page 31: ...27 Communication and DC12V cable wiring Power cable wiring ...