⇔
⇔
20.
20. If required, connect t
If required, connect the hand set PSV
he hand set PSV-Z-051 to the 12-pin circular jack
-Z-051 to the 12-pin circular jack
REMOTE CONTROL on the front of the scanning head.
REMOTE CONTROL on the front of the scanning head.
21.
21. If appli
If applicable
cable, plug the
, plug the
cable from the connector box of the
cable from the connector box of the
optional pan-tilt stage into the 4-pin circular jack on
optional pan-tilt stage into the 4-pin circular jack on the underside of the
the underside of the
scanning head.
scanning head.
22.
22. Pl
Plug th
ug the
e
cable from the
cable from the connector box of the pan-tilt stage into
connector box of the pan-tilt stage into
the circular jack on
the circular jack on the pan-tilt stage.
the pan-tilt stage.
23.
23. Plug a mains cable into the back of the workstati
Plug a mains cable into the back of the workstation and into a wall socket
on and into a wall socket
providing protective grounding.
providing protective grounding.
24.
24. Plug a mains cable into the back of the junc
Plug a mains cable into the back of the junction box and into a wall socket
tion box and into a wall socket
providing protective grounding.
providing protective grounding.
25.
25. Plug a mains cable into the back of the contro
Plug a mains cable into the back of the controller and into a wall socket
ller and into a wall socket
providing protective grounding.
providing protective grounding.
26.
26. If applicable, plug a mains cab
If applicable, plug a mains cable into the connector box of the pan-tilt
le into the connector box of the pan-tilt
stage and into a
stage and into a wall socket providing protective grounding.
wall socket providing protective grounding.
The PSV is now completely installed. Carry out a functional test as described
The PSV is now completely installed. Carry out a functional test as described
in
in se
se
ct
ct
ion
ion
3.5
3.5
..
check the setting of the voltage selectors on the back of the workstation and the
check the setting of the voltage selectors on the back of the workstation and the
controller as well as the rating of the fuses on the back of the controller and the junction box
controller as well as the rating of the fuses on the back of the controller and the junction box
connecting to the mains!
connecting to the mains!
check the setting of the voltage selector on the connector box of the pan-tilt stage
check the setting of the voltage selector on the connector box of the pan-tilt stage
connecting to the mains!
connecting to the mains!
Summary of Contents for PSV 300
Page 48: ......
Page 64: ......
Page 73: ...Figure 7 2 Views of the scanning head OFV 056 Figure 7 2 Views of the scanning head OFV 056...
Page 76: ......
Page 92: ......
Page 93: ...Figure D 1 PSV 300 declaration of conformity Figure D 1 PSV 300 declaration of conformity...
Page 94: ......