![POLIURS CV4.04 Montage Instructions Download Page 13](http://html1.mh-extra.com/html/poliurs/cv4-04/cv4-04_montage-instructions_1574149013.webp)
HEATING MAIN MONTAGE INSTRUCTIONS CV4.04
3. Continue checking wire resistance as
you connect more and more pipes into
the loop. Continue recording your
results in the journal.
4.
In
article
1
mentions
insulation
resistance should be greater than 100
M
Ω
.
5. After checking for resistance connection of alarm system wires is performed in such
steps:
Cut straightened wire ends so that after
connection they are not hanging. Wire
ends of approximately 1-2 cm should be
cleaned carefully with sand paper.
Insert one end of the wire into the splicing
pliers and compress it with special tongs.
Insert and compress the other wire end.
Connection is brazes with the special
splicing sleeve.
Connect wires at the other end of the pipe
the same way.
For wires not to touch steel pipes they are
secured with special wire holder.
Place wire holders symmetrically and
attach them to steel pipe with duct tape.
7.2.