8.40
9925723 R01 - 2015
RZR
900 Service Manual
© Copyright 2014 Polaris Industries Inc.
27. Install compression side valve stack.
NOTE: When installing bleed shim, ensure the
tab is lined up with compression port.
28. Install rebound valve stack with required top out
washer.
29. Apply a thin layer of float fluid to the threads, nut, or
BOC post and torque to 22 ft-lbs (30 Nm).
30. Install BOC post valving.
NOTE: Ensure retaining ring is fully installed and
secure.
31. Install BOC piston and retaining ring.
32. Apply Loctite® primer to the body cap threads.
STEERING / SUSPENSION