FINAL DRIVE
7.9
16--19 ft.lbs.
NOTE: The chain maybe installed at this point or later
in the procedure.
3.
Install the spacer and sprocket guard (D). Install
the sprocket guard nuts, torque to 25--30 ft.lbs.
(34--41 Nm).
4.
Install the O--ring (E), brake disc (F), and axle nut
(G) onto the axle.
G
F
E
5.
Install the retaining ring (H) onto the axle.
It
should fully seat into the groove.
6.
Turn the axle nut outward with a 1 3/4” Wrench
(PN 2870772) until the end of the axle nut (G) just
covers the retaining ring (H). The retaining ring
should still be visible under the axle nut from an
angle. Torque to 8--10 ft.lbs. (11--14 Nm)
H
7.
Torque the axle nut pinch bolt to 50 in.lbs. (6 Nm).
50 in.lbs.
H
8.
Reinstall the chain and master link.
To verify
proper chain tension, refer to Chapter 2 “DRIVE
CHAIN INSPECTION” for this procedure.
9.
Torque the eccentric clamp bolts to 35 ft.lbs. (47
Nm).
35 ft.lbs.
10. Install caliper, two mounting bolts and lock washers.
Torque mounting bolts to 18 ft.lbs. (25 Nm).
PartShark.com
877-999-5686
Summary of Contents for 2009 Trail Blazer 330
Page 94: ...ENGINE 3 48 NOTES P a r t S h a r k c o m 8 7 7 9 9 9 5 6 8 6 ...
Page 110: ...FUEL SYSTEM CARBURETION 4 16 NOTES P a r t S h a r k c o m 8 7 7 9 9 9 5 6 8 6 ...
Page 124: ...BODY STEERING SUSPENSION 5 14 NOTES P a r t S h a r k c o m 8 7 7 9 9 9 5 6 8 6 ...
Page 196: ...ELECTRICAL 10 4 REVERSE LIMIT SYSTEM P a r t S h a r k c o m 8 7 7 9 9 9 5 6 8 6 ...
Page 226: ...ELECTRICAL 10 34 NOTES P a r t S h a r k c o m 8 7 7 9 9 9 5 6 8 6 ...
Page 227: ...ELECTRICAL WIRING DIAGRAM 2009 TRAIL BOSS P a r t S h a r k c o m 8 7 7 9 9 9 5 6 8 6 ...
Page 228: ...ELECTRICAL WIRING DIAGRAM 2009 TRAIL BOSS P a r t S h a r k c o m 8 7 7 9 9 9 5 6 8 6 ...
Page 229: ...ELECTRICAL WIRING DIAGRAM 2009 TRAIL BLAZER P a r t S h a r k c o m 8 7 7 9 9 9 5 6 8 6 ...
Page 230: ...ELECTRICAL WIRING DIAGRAM 2009 TRAIL BLAZER P a r t S h a r k c o m 8 7 7 9 9 9 5 6 8 6 ...