Legion Solar Installation and Operations Manual
Installing O
ff
Grid Controller and O
ff
Grid Inverter
WARNING! Follow the steps below in sequential order for safety. Ensure that all terminals are covered after
each step to reduce the risk of short circuit. O
ff
grid controller is compatible with both 24V Lithium and 24V
Lead Acid Batteries. O
ff
Grid Controller is NOT fused. When connecting Lead Acid batteries, ensure that
the 150A Black Fuse Wire (supplied with Battery Commander) is installed for safety. When connecting
Legion Solar Lithium Batteries, the 150A Black Fuse Wire is not used. The built-in Battery Management System will
protect against short circuits.
Copyright © 2021 PLX Devices Inc.
24
Step4:
Purchase an uninterruptible power supply (UPS). This is
required
if you have ANY sets with Battery Commander. If you do NOT
have any sets with Battery Commander, a UPS is optional but
recommended.
A UPS is a device with a built-in battery to supply AC power when
grid power goes down. A rating of 400VA or larger is
recommended. UPS is not included.
Step5:
Plug the AC cord from Solar Regulator into any AC outlet. If you’re
using a UPS, plug the AC cord into the Battery Backup receptacle
(not surge only).
Tip: Disconnect the AC cord from the UPS to simulate a power
outage and check if Solar Regulator LED indicator lights remains
on.
Step6:
Download Legion Solar app for iOS/Android and follow the
instructions in the app to setup and calibrate your system.
*Please ensure that you smartphone is within 20ft line of sight
for best wireless performance. Enable bluetooth and location
services.