Installation:
1. Screw in the fixing stud (C) into the base of the tap (A).
2. Place the upper seal (B) over the fixing stud (C) to the base of the tap body (A).
3. Screw the hot and cold tail pipes (H) into the base of the tap body (A).
4. Place the mixertap (A) onto the sink or worktop and pass the tail pipes (H) and fixing stud (C) through the taphole. With the tap in
place check that the tail pipes (H) meet the hot and cold water feeds. If further adjustment to the plumbing is required do this now.
5. If fitting the tap to a stainless steel sink, the white triangular stabiliser (D) can be placed where shown to help to stabilise the weight
of the tap.
6. Pass the rubber gasket (E) and then metal horseshoe (F) over the fixing stud (C) and around tail pipes (H).
7. Fasten the fixing nut (G) securely onto the fixing stud (C) fixing the tap into its correct location.
8. Connect the hot & cold water tail pipes (H) to the water supplies using ½” BSP x 15mm compression fittings or similar. Note the tail
pipes (H) can be ‘doglegged’ to allow more space to attach fittings.
Key:
Description:
Qty.
A
Tap body
1
B
Upper seal
1
C
Fixing stud
1
D
White triangular stabiliser
(for stainless steel sinks only)
1
E
Rubber gasket
1
F
Metal horseshoe
1
G
Fixing nut
1
H
Hot & cold inlet tail pipes
2
After installation:
Once you have visually checked the installation of the new
tap and all connections, ensure that all other fittings are
closed except the new tap which should be left open.
Turn on your water heating system and ensure that your
mains stopcock is open. Reconnect both the hot and cold
water supplies to this fitting.
Check the function of flow and function of hot, cold and
mixed water.
Turn off the tap and check carefully for any leaks around all
connections on the fitting and adjoining plumbing.
If possible return to the installation after a longer period to
double check for slower leaks. If pressure testing
equipment is available check the installation to the
maximum recommended pressure.
Clean the tap to remove any marks created during
installation as instructed then place a bag over the product
to protect the tap until it is ready for use.
The installation should be periodically checked for damage,
if the property is left unattended for a prolonged period we
recommend isolating water supplies.