background image

Instructions for Use

Urinal flush plate for Prevista

Visign for Style 20

for urinal flushing systems

Model

Year built (from)

8610.2

03/2019

INT

Summary of Contents for 8610.2

Page 1: ...Instructions for Use Urinal flush plate for Prevista Visign for Style 20 for urinal flushing systems Model Year built from 8610 2 03 2019 INT ...

Page 2: ...2 Maintenance 5 2 3 Product description 6 2 3 1 Overview 6 2 3 2 Technical data 6 3 Handling 7 3 1 Assembly information 7 3 1 1 Required material and tools 7 3 2 Assembly 7 3 2 1 Insert cartridge valve 7 3 2 2 Mounting the flush plate 11 3 3 Errors faults and remedy 14 3 4 Care and maintenance 14 3 4 1 Care tips 14 3 4 2 Cleaning cartridge valve 14 3 5 Disposal 17 Table of contents Urinal flush pl...

Page 3: ...nd to possible operating instructions The installation of Viega products must take place in accordance with the general rules of engineering and the Viega instructions for use 1 2 Labelling of notes Warning and advisory texts are set aside from the remainder of the text and are labelled with the relevant pictographs DANGER This symbol warns of possible life threatening injury WARNING This symbol w...

Page 4: ...ny e g DIN DVGW Some passages in the text may refer to technical codes in Europe Germany These should serve as recommendations in the absence of corresponding national regulations The relevant national laws stand ards regulations directives and other technical provisions take priority over the German European directives specified in this manual The information herein is not binding for other count...

Page 5: ...ulations applicable in Ger many Flush flow DIN 3265 Noise class DIN 4109 2 2 Intended use 2 2 1 Areas of use The urinal flush plate is intended for the actuation of flushes in urinals 2 2 2 Maintenance The cartridge valve should be cleaned once a year to ensure fault free operation See Ä Chapter 3 4 2 Cleaning cartridge valve on page 14 Product information Urinal flush plate for Prevista Visign fo...

Page 6: ...tallation frame 2 3 2 Technical data The product has the following technical data Minimum flow pressure 0 05 0 5 MPa 0 5 5 bar Flush flow see Ä Regulations from section Technical data on page 5 0 3 0 7 l s Noise class see Ä Regulations from section Technical data on page 5 Class 2 Product information Urinal flush plate for Prevista Visign for Style 20 6 ...

Page 7: ...ze 27 n flat blade screwdriver 3 2 Assembly 3 2 1 Insert cartridge valve Requirements n The pre wall element has been mounted n The tiling work is completed n The revision opening is freely accessible n The urinal ceramic has been mounted Cut into the sticky tape of the shaft cover Tool Handling Urinal flush plate for Prevista Visign for Style 20 7 ...

Page 8: ... Fold the sides of the revision shaft outwards up to the tile level and snap them off Open the shut off with a screwdriver for a few seconds to rinse the pipeline Re close the shut off Remove the seal Y 5s Handling Urinal flush plate for Prevista Visign for Style 20 8 ...

Page 9: ...ge valve INFO Check that the sealing element is properly positioned Place the cartridge valve on straight and carefully screw in fine thread Tightening torque 5 Nm Screw in the cartridge valve size 27 N Handling Urinal flush plate for Prevista Visign for Style 20 9 ...

Page 10: ... Checking for leak tightness Set the flush volume Setting range 1 l to 6 l Actuate a flushing and check the set flush volume Re set the flush volume if applicable Handling Urinal flush plate for Prevista Visign for Style 20 10 ...

Page 11: ...is mounted and set Insert the actuator Observe proper alignment Apply the installation frame Place the sleeve over the actuator Measure the actuator INFO The actuator must not protrude over the sleeve 9 9 Handling Urinal flush plate for Prevista Visign for Style 20 11 ...

Page 12: ...and actuator off again Cut the actuator to length Insert the actuator Observe proper alignment Apply the installation frame Place the sleeve over the actuator NN 9 NN Handling Urinal flush plate for Prevista Visign for Style 20 12 ...

Page 13: ...lts again and cut the segments to length Slide the retaining bolt in as far as it will go Align the installation frame Turn the retaining bolts by 90 in a clockwise direction To fix the retaining bolts turn safety rings in a clockwise direction 煉 Handling Urinal flush plate for Prevista Visign for Style 20 13 ...

Page 14: ...ge 14 The urinal flush runs through The cartridge valve dirty or dam aged Clean the cartridge valve if neces sary replace it Ä Chapter 3 4 2 Cleaning car tridge valve on page 14 3 4 Care and maintenance 3 4 1 Care tips Use normal soap or a mild cleaning agent for regular care and preven tion of lime scale on the flush plate Under no circumstances should scouring agent or scratching objects be used...

Page 15: ...te from the installation frame Turn the safety rings 90 anti clockwise Turn the retaining bolts 90 anti clockwise Turn the sleeve 90 clockwise to unlatch it 煉 Handling Urinal flush plate for Prevista Visign for Style 20 15 ...

Page 16: ...e cartridge valve Rinse the cartridge valve under running water Remove coarse dirt with a soft brush Re mount the cartridge valve and the flush plate in accordance with Ä Chapter 3 2 1 Insert cartridge valve on page 7 Handling Urinal flush plate for Prevista Visign for Style 20 16 ...

Page 17: ...rate the product and packaging materials e g paper metal plastic or non ferrous metals and dispose of in accordance with valid national legal requirements Handling Urinal flush plate for Prevista Visign for Style 20 17 ...

Page 18: ...Viega Technology GmbH Co KG service technik viega de viega com INT 2020 07 VPN200176 ...

Reviews: