22
8.
Reading and changing parameters
The Ceiling Hoist will be configured in the factory. Parameters can be read and changed. We as PLS
recommend changing as little parameters as possible to avoid errors in the operation.
8.1.
Reading Ceiling Hoist and changing parameters
The following settings can be read and changed:
Reading
Changing
Default
Cycle counter Motor 1 (main drive)
Bedroom mode
Off
Cycle counter Motor 2 (Spreader Bar
motor)
Max. power consumption Motor 1 (up)
AR-200: 11000
AR-260: 15000
AR-350: 18000
Current Battery Voltage
Max. power consumption Motor 1 (down)
11000
Current power consumption Motor 1
Max. power consumption Motor 2 (left)
4000
Current power consumption Motor 2
Max. power consumption Motor 2 (Right)
5000
Software version
Power saving mode
On
Programming date
8.2.
Operation Mode
The settings of the Ceiling Hoist can be changed by connecting the Programming Box to the Circuit Board.
1.
Turn the Ceiling Hoist off.
2.
If the Ceiling Hoist has not yet been opened, remove the bottom cover (
chapter 3.1
).
3.
Connect the Programming Box to the Circuit Board (
Figure 24
and Figure 28
).
4.
Connect the Hand Control to the Ceiling Hoist.
5.
Activate the Ceiling Hoist.
6.
Hold the ‘
down
’ and ‘
left
‘
simultaneously for 3
seconds to go, via Password Mode, to Service
Menu.
The display of the Programming Box shows the following:
P
L
S
T
i
l
l
i
f
t
1 0 0 % /
/
/
/
C u
r
M 1
=
0
m A
C u
r
M 2
=
0
m A
PLS tillift
= manufacturer and product name (tillift = Ceiling Hoist in Dutch)
100%
= Battery status
Cur M1
= number of milliamperes used by Motor 1 at that moment.
Cur M2
= number of milliamperes used by Motor 2 at that moment.
Figure 30, PLS Hand Control
Figure 29, 2017 Hand control
Figure 28, programming box connection