PLP POWER MAX Dual Tilt Array Installation Manual Download Page 9

Install two High Load 

Brackets for each set 

of Modules. Place 

one Bracket under the 

lower (as shown) and 

one under the upper 

edge of each set of 

two Modules.

POWER MAX™ Accessories Installation Guide, Tilted (5°, 10°), Dual Tilt and Flush Arrays

Installing High Load Brackets - Tilted (5° & 10°), and Dual Tilt Array

High Load Brackets 

are used in those 

areas where heavy 

snow loads or other 

conditions require 

additional Module 

support.

NOTE

1.  Orient the High 

Load Bracket as 

shown, aligning 

its notches with 

the upright tabs 

of the Module 

Bracket. 

2.  Install the 

Modules and the 

AMP™ Clamp 

per Assembly 

Instructions, se-

curing High Load 

Bracket in place 

underneath the 

Modules.

POWER MAX™ Accessories Installation Guide, Tilted (5°, 10°), Dual Tilt and Flush Arrays 

7

Summary of Contents for POWER MAX Dual Tilt Array

Page 1: ...POWER MAXTM Accessories Tilted 5 10 Dual Tilt Flush Arrays Installation Guide SP3470 1 ...

Page 2: ...his product is intended for use by trained technicians only This product should not be used by anyone who is not familiar with and not trained to use it When working in the area of energized lines extra care should be taken to prevent accidental electrical contact Be sure to wear proper safety equipment per your company protocol For proper performance and personal safety be sure to select the prop...

Page 3: ...y 4 Installing PipeGuard Conduit Support All Systems 5 Installing a Microinverter Optimizer Tilted 5 10 Array only 5 Installing Roof Protection Pads All Systems 6 Installing Deflectors Tilted 10 Array only 6 Installing High Load Brackets Tilted 5 10 Array and Dual Tilt Array 7 Installing Unistrut Rail For Excessive Loads Only Tilted 5 10 Array only 8 Installing Seismic Attachments All Systems 10 1...

Page 4: ... on top of the Valley Bracket as shown using the existing Flange Nut Torque to 15 ft lbs Using the hardware provided in the Z Bracket Kit attach the Snake Tray Bracket to the Z Bracket Tighten securely Attach the Snake Tray to the Bracket using 5 16 x 3 4 Hex Screw Flat Washer and Flange Nut Tighten securely For more on Snake Tray see snaketray com Snake Tray is a registered trademark owned by Cab...

Page 5: ...e Front Bracket as shown or the Rear Bracket using the existing Flange Nut Torque to 15 ft lbs Using the hardware provided in the Z Bracket Kit attach the Ratchet P Clamp to the Z Bracket Tighten securely For more on Ratchet P Clamps see hellermanntyton us POWER MAXTM Accessories Installation Guide Tilted 5 10 Dual Tilt and Flush Arrays Installing Snake Tray Cable Runs cont Flush Array Tilted 5 10...

Page 6: ...ay above right If attaching to the Module Stop Bracket secure the Ratchet P Clamp using the existing Flange Nut Torque to 15 ft lbs For the Tray attachment use the hardware provided in the Z Bracket Kit Secure the Z Bracket to the Tray and then secure the Ratchet P Clamp to the top of the Z Bracket Torque to 15 ft lbs For more on Ratchet P Clamps see hellermanntyton us POWER MAXTM Accessories Inst...

Page 7: ...ion and source For more on PipeGuard see omgroofing com Attach the Mounting Bracket under the Front Bracket using the existing Flange Nut Torque to 15 ft lbs Using the hardware provided in the Mounting Bracket Kit attach the Microinverter Optimizer to the underside of the Mounting Bracket Tighten securely POWER MAX Accessories Installation Guide Tilted 5 10 Dual Tilt and Flush Arrays Installing Pi...

Page 8: ... as needed then tighten the Flange Nuts Torque to 15 ft lbs Insert the Backing Plate through the Back Bracket and the overlapping Deflectors Thread on 5 16 Flange Nuts Adjust the Deflectors from side to side as needed then tighten the Flange Nuts Torque to 15 ft lbs POWER MAX Accessories Installation Guide Tilted 5 10 Dual Tilt and Flush Arrays Installing Roof Protection Pads All Systems Installin...

Page 9: ... Arrays Installing High Load Brackets Tilted 5 10 and Dual Tilt Array High Load Brackets are used in those areas where heavy snow loads or other conditions require additional Module support NOTE 1 Orient the High Load Bracket as shown aligning its notches with the upright tabs of the Module Bracket 2 Install the Modules and the AMP Clamp per Assembly Instructions se curing High Load Bracket in pla...

Page 10: ...s of 30 psf 650 lbs module Unistrut Rails are only needed on Tilted 5 10 systems with excessive loads Dual Tilt systems utilize a shared Peak Bracket which prevents any outside edge rows from slipping under excessive loads NOTE Item Description Qty Supplied By 1 3 8 x 1 1 4 Hex Bolt Lockwasher Stainless Steel 4 Customer 2 Channel Nut Unistrut p n P3008 or Equivalent 2 Customer 3 Square Washer Unis...

Page 11: ... the Module mounting holes and install the Module End Clamps on the long edge of the Module POWER MAX Accessories Installation Guide Tilted 5 10 Dual Tilt and Flush Arrays Installing Unistrut Rails Tilted 5 10 Array cont 9 ...

Page 12: ... the Ballast Trays and position N S to accommodate roof attachment locations As needed Splice Unistrut sections together Torque to 20 ft lbs Secure the Unistrut to the Ballast Trays it s only necessary to secure the north end of each Ballast Tray Torque to 20 ft lbs Install secure the Roof Anchor to the rooftop Secure the Unistrut to the Roof Anchor with the Seismic Attachment and hardware Torque ...

Page 13: ...11 ...

Page 14: ...12 ...

Page 15: ...13 ...

Page 16: ...Global Headquarters 660 Beta Drive Mayfield Village OH 44143 Telephone 440 461 5200 Fax 440 442 8816 preformed com info plpsolar com 2020 Preformed Line Products SP3470 1 ...

Reviews: