Installation and user handbook – rev.0.4 of 23.02.2017
59
Before opening the water supply and starting the system, make sure that all
the safety components have been installed as indicated in the basic hydraulic connection
layout.
f)
Finally, open a hot water tap to check if the water is being supplied correctly, and to
eliminate the residue air in the system water supply line.
g)
After this, the cover sheet can be removed.
Because of the thermal inertia of the system, the
“EGO”
solar collector with
integrated storage requires a few days of sunshine to run at full capacity. The system
normally reaches the usage temperatures after a full day of sunshine.
WORKING PRESSURE
The maximum working pressure in the system must not exceed 4 bar (400 kPa). The value
indicated on the data plate applied to the product must obviously never be exceeded.
DANGER OF OVERPRESSURE
. Make sure that the maximum pressure of
the supply line never exceeds the working pressure of
“EGO”
system. If it does, insert a
suitable pressure reducer.
Summary of Contents for EGO 110
Page 30: ...Installation and user handbook rev 0 4 of 23 02 2017 30 Installation phases...
Page 31: ...Installation and user handbook rev 0 4 of 23 02 2017 31...
Page 32: ...Installation and user handbook rev 0 4 of 23 02 2017 32...
Page 33: ...Installation and user handbook rev 0 4 of 23 02 2017 33...
Page 34: ...Installation and user handbook rev 0 4 of 23 02 2017 34...
Page 39: ...Installation and user handbook rev 0 4 of 23 02 2017 39 Installation phases...
Page 40: ...Installation and user handbook rev 0 4 of 23 02 2017 40...
Page 41: ...Installation and user handbook rev 0 4 of 23 02 2017 41...
Page 42: ...Installation and user handbook rev 0 4 of 23 02 2017 42...
Page 43: ...Installation and user handbook rev 0 4 of 23 02 2017 43...
Page 44: ...Installation and user handbook rev 0 4 of 23 02 2017 44...
Page 46: ...Installation and user handbook rev 0 4 of 23 02 2017 46...
Page 55: ...Installation and user handbook rev 0 4 of 23 02 2017 55...