Installation instructions

for contractors

VIESMANN

Vitosol-F
Type SV and SH

Flat-plate collector for elevated installation

VITOSOL-F

5727 904 GB

8/2010

Dispose after installation.

Содержание Vitosol-F Type SH

Страница 1: ...Installation instructions for contractors VIESMANN Vitosol F Type SV and SH Flat plate collector for elevated installation VITOSOL F 5727 904 GB 8 2010 Dispose after installation ...

Страница 2: ...gulations Observe the following when working on this system National installation requirements Legal instructions regarding the pre vention of accidents Legal instructions regarding environ mental protection The Code of Practice of relevant trade associations All current safety regulations as defined by DIN EN DVGW VDE and all locally applicable standards a ÖNORM EN and ÖVE c SEV SUVA SVTI SWKI an...

Страница 3: ...ts 4 Determining collector row clearance z 5 Installation information 6 Mounting collector supports and collectors 8 Installing the connection set and collector temperature sensor 11 Installation 13 Commissioning 14 Index 5727 904 GB ...

Страница 4: ... 45 or 60 angle of inclination 6 4 2 3 5 8 7 1 9 1 5 7 5 1 5 7 5 1 SV 60 1 Collector support with footplates 2 Washer 7 8 4 mm 3 Hexagon nut M 8 4 Hexagon bolt M 8 x 20 5 Mounting plate 6 Clamping bracket 7 Connecting plate 8 Cross brace 9 Hexagon bolt M 8 x 25 Components 5727 904 GB ...

Страница 5: ...g ring fitting angle 7 22m 90 qZ Support sleeve Accessories for one solar thermal system Sensor well set comprising qZ Support sleeve qU Locking ring fitting tee 7 22 mm qI Sensor well qO Strain relief fitting wP Thermal insulation Determining collector row clearance z When installing several collectors in ser ies maintain a clearance of z to prevent undesirable shading Components cont 5727 904 GB...

Страница 6: ...0 5595 2485 45 6710 2980 60 7350 3260 Installation information Where possible the collector array should face due south Observe the maximum load and dis tance from the edge of the roof for the on site substructure to DIN 1055 Installation on concrete slabs A see diagram on page 8 Remove any gravel or similar from the installation area cover the surface with protective building mats and posi tion t...

Страница 7: ...e 8 Install the on site substructure at right angles to and horizontally level with the collector orientation For calculating the ballast the Viessmann SOLSTAT calculation program is available at www viessmann com Installation information cont 5727 904 GB ...

Страница 8: ... each of 1 to 6 collectors secure two cross braces diagonally side by side to the adjustable supports y x a 1 8 5 3 2 4 4 A B 4 2 1 4x 3 4 8 2 3 2 4 5 2 Mounting collector supports and collectors 5727 904 GB ...

Страница 9: ...e with the type plate must be on the outside of the first and last col lector Secure the pipework on only one col lector opposite the side with the type plate Please note Connection pipes should not show any signs of damage Lubricate O ring seals only with the special instrument grease provided Mounting collector supports and collectors cont 5727 904 GB ...

Страница 10: ... 10 9 2x Z Secure the connecting plate onto the top of the clamping brackets between the 2nd and 3rd 4th and 5th collector supports etc Dim z 21 mm C Collector connection D Type plate Mounting collector supports and collectors cont 5727 904 GB ...

Страница 11: ...o the locking ring fit ting as far as it will go Initially turn the union nut by hand then tighten with an open ended span ner by a further turn Please note There should be no signs of damage on the connecting pipes or plug Lubricate O ring seals only with the special instrument grease provided Never fit annealed copper pipes onto the locking ring fittings Installing the connection set and collect...

Страница 12: ...on C Flared coupling D Type plate Please note The collectors may be damaged if the solar thermal system is not filled with heat transfer medium immediately after installation Therefore protect the collectors from solar radiation by covering them up Installing the connection set and collector cont 5727 904 GB ...

Страница 13: ...the most suitable If other seals such as flat gaskets are used adequate glycol pressure and temperature stability must be guaran teed by the manufacturer Make all connections pressure and temperature resistant observe the maximum idle temperature of the col lector Never use Teflon inadequate glycol stability Hemp connections not sufficiently gas tight Equip systems to EN 12975 with an expansion ve...

Страница 14: ...essel E Stagnation heat sink F Shut off valve G Filling H Manual solar fill pump K Fill valve F G L L Drain M Air separator N DHW cylinder O Solar control unit P Air vent valve Commissioning For commissioning the solar thermal system see the Vitosol service instruc tions Installation cont 5727 904 GB ...

Страница 15: ...15 5727 904 GB ...

Страница 16: ... 1952 675000 Fax 44 1952 675040 E mail info uk viessmann com Viessmann Werke GmbH Co KG D 35107 Allendorf Telephone 49 6452 70 0 Fax 49 6452 70 2780 www viessmann com 5727 904 GB Subject to technical modifications Printed on environmentally friendly chlorine free bleached paper ...

Отзывы: