
Installation and user handbook – rev.0.4 of 23.02.2017
29
The longest side of the collector must always be supported by the surface. Do not install
the collector with the short side (where the connections are) against the surface.
Do not turn the collector upside down. The outflow should be positioned at the top, and can
be identified by its red cap (inflow at the bottom, identified by a blue cap). Correct
operation cannot be guaranteed if the system is installed upside down.
Necessary items
2 spanners, 13 mm
individual PPE (helmet, gloves, goggles, etc...)
Danger! The screws for fixing the supports to the roof are not supplied. They
must be obtained by the installer, following the indications of the structural technician.
Summary of Contents for EGO 110
Page 30: ...Installation and user handbook rev 0 4 of 23 02 2017 30 Installation phases...
Page 31: ...Installation and user handbook rev 0 4 of 23 02 2017 31...
Page 32: ...Installation and user handbook rev 0 4 of 23 02 2017 32...
Page 33: ...Installation and user handbook rev 0 4 of 23 02 2017 33...
Page 34: ...Installation and user handbook rev 0 4 of 23 02 2017 34...
Page 39: ...Installation and user handbook rev 0 4 of 23 02 2017 39 Installation phases...
Page 40: ...Installation and user handbook rev 0 4 of 23 02 2017 40...
Page 41: ...Installation and user handbook rev 0 4 of 23 02 2017 41...
Page 42: ...Installation and user handbook rev 0 4 of 23 02 2017 42...
Page 43: ...Installation and user handbook rev 0 4 of 23 02 2017 43...
Page 44: ...Installation and user handbook rev 0 4 of 23 02 2017 44...
Page 46: ...Installation and user handbook rev 0 4 of 23 02 2017 46...
Page 55: ...Installation and user handbook rev 0 4 of 23 02 2017 55...