STEP 17: BRIDGE RAIL SLATS
1. IF THE BRIDGE RAIL SLATS ARE NOT ALREADY PRE-DRILLED THEN PRE-DRILL THEM ON EACH END WITH A 1/8" DRILL
BIT. (SEE TOP IMAGE BELOW)
2. PLACE THE BRIDGE RAIL SLATS 3" FROM THE FACE OF THE CORNER POSTS, AND ATTACH WITH 2" WOOD SCREWS.
THE SLATS WILL MOUNT ON THE OUTSIDE OF THE BRIDGE RAILS.
3. ATTACH THE REMAINING SLATS TO THE UNIT WITH 3" SPACING BETWEEN THE SLATS.
SLAT
5/4 X 3 X 16"
BRIDGE RAIL
2" WOOD SCREW
5/4 X 3 X 16"
BRIDGE RAIL SLAT
3
4
"
"
1 16
5
5
16 "
"
4
1
1 3
1
2X
1
8 "
LEFT SIDE VIEW
3" SPACE OFF CORNER POST
3" SLAT SPACING
119
Summary of Contents for 1500DT
Page 6: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Page 8: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Page 112: ...PART 2 CLATTER BRIDGE ASSEMBLY 102...
Page 142: ...APPENDIX 132...