background image

www.playcraftsystems.com

For Customer Service Call

800.333.8519 (U.S.A.) or 541.955.9199 (International)

SPIN MAX TOWER

INSTALLATION INSTRUCTIONS

Rev G

2/18/2021

PC-2476

Page 9 of 9

SPIN MAX BASE:

Shall be constructed of UV-stabilized, rotationally 

molded, linear, low density polyethylene with an 

average wall thickness of .250".

SPIN MAX BEARING HOUSE:

Shall be machined using 5" O.D. 1/2" wall with 

welded 3/8" thick steel mounting plate and will 

have a multi-stage baked-on powder coat finish.

SPIN MAX POST SUPPORT:

Shall be fabricated using 5" O.D. 7 gauge steel 

post with  welded 3/8" thick steel plate and will 

have a multi-stage baked-on powder coat finish.

SPIN MAX SUPPORT

 

RING:

Shall be fabricated using 2" square 11 gauge steel 

outer ring with welded 3/8" thick steel splice bars 

and will have a multi-stage baked-on powder coat 

finish.

SPIN MAX TOWER POST:

Shall be fabricated using 5" O.D. 7 gauge steel 

tubing with welded 3/8" thick steel top plate, 1/4" 

thick steel bottom plate and machined steel 

spindle and will have a multi-stage baked-on 

powder coat finish.

SPEED LIMITER ARM:

Shall be fabricated using 1-1/4" square 16 gauge 

steel tubing with welded 3/8" thick steel plug and 

3/16" thick steel clevis and will have a multi-stage 

baked-on powder coat finish.

SPEED LIMITER BASE:

Shall be fabricated using 1/4" thick steel plate with 

welded 3/16" thick steel tabs and 3/8" thick steel 

ring blocks and will have a multi-stage baked-on 

powder coat finish.

ROPE CLEVIS:

Shall be formed using 3/16" thick stainless steel 

and will have a multi-stage baked-on powder coat 

finish.

SPIN MAX TOWER NET:

Shall be made from 16mm steel-reinforced rope 

with high-strength copolymer plastic intersection 

connectors and machined aluminum end ferrules.

SPIN MAX BASE SPACERS & 

ROTO FERRULE PLUGS:

Shall be machined from high strength aluminum. 

SPIN MAX COVER PANEL HALVES, 

TOP COVERS & TOP PLATE TRIM:

Shall be made from high density 3/4" sheet plastic 

specially formulated for optimum UV stability and 

color retention.

Specifications

POST CAP R5 DOME:

Shall be precision die-cast from a high-strength 

aluminum alloy and will have a multi-stage baked-

on powder coat finish.

HARDWARE:

Shall be stainless steel, zinc/nickel plated or 

galvanized as required to resist rust and corrosion.

Specifications

Periodically tighten all screws, bolts and nuts. A 

periodic inspection of all parts is necessary. If a part 

is broken or worn, replace immediately. For general 

maintenance please refer to our Playground 

Maintenance Manual.

Maintenance

Summary of Contents for PC-2476

Page 1: ...7 standards The maximum rotations per minute for Spin Max events shall be no greater than 31 Test with the applied force of a male adult between the ages of 18 to 34 150 lbs 68 kgs to 190 lbs 86 kgs a...

Page 2: ...d Soil Top of Surfacing Label C P I P TILE Footing Detail Varies 3 3in DETAIL C SCALE 1 12 Finish Grade Top of Soil Optional Filter Fabric over Pea Gravel for drainage Concrete Footing P I P TILE SURF...

Page 3: ...MAX TOWER INSTALLATION INSTRUCTIONS Rev G 2 18 2021 PC 2476 Page 3 of 9 72 72in Refer to current ASTM 1487 standards The Use Zone for Rotating Play equipment shall be no less than 72 1829mm in all di...

Page 4: ...RM 3 8 Thin Lock Nut 3 8 x 7 8 O D Washer 3 8 x 2 1 4 Button Head Bolt 3 8 x 7 8 O D Washer 1 3 8 x 5 8 THICK NYLON WASHER 2 1 2 WHEEL 1 3 8 x 5 8 THICK NYLON WASHER Step 4 Factory Assembled Attach 2...

Page 5: ...UBLE SEAL BALL BEARING SNAP RING SPIN MAX BEARING HOUSE SPIN MAX BASE TOWER POST 3 8 x 1 O D Washer 3 8 Lock Nut Step 5 Factory Assembled Insert Tower Post through Spin Max Base and attach to Spin Max...

Page 6: ...D Washer 3 8 x 1 11 16 Button Head Bolt 3 8 x 3 4 Button Head Bolt 3 8 x 7 8 O D Washer 3 8 Thin Lock Nut 3 8 x 1 3 8 Barrel Nut 1 2 SAE Washer TOP TRIM BOTTOM TRIM 3 8 x 1 O D Washer 3 8 x 1 1 2 But...

Page 7: ...HTENING TORQUE FOR HARDWARE section of the Installation Manual Step 13 Plumb and level entire component Pour concrete into footing hole Allow at least 72 hours to cure before proceeding to next step S...

Page 8: ...Top Plate Trim Bottom 1 EE 0228 TOP Spin Max Top Plate Trim Top 1 FS PC2476 BHS Spin Max Bearing House 1 FS PC2476 LTR Speed Limiter Arm 3 FS PC2476 PST Spin Max Tower Post 1 FS PC2476 RNG Spin Max S...

Page 9: ...d 3 8 thick steel plug and 3 16 thick steel clevis and will have a multi stage baked on powder coat finish SPEED LIMITER BASE Shall be fabricated using 1 4 thick steel plate with welded 3 16 thick ste...

Reviews: