background image

www.playcraftsystems.com

For Customer Service Call

800.333.8519 (U.S.A.) or 541.955.9199 (International)

SPIN MAX TOWER

INSTALLATION INSTRUCTIONS

Rev G

2/18/2021

PC-2476

Page 7 of 9

3/8" x 5-1/2"  

Hex Bolt

FIGURE 8

1/2" Lock Nut

1/2" Washer x 

.116 Thick

POST SUPPORT

1/2" x 1-3/4" 

Button Head Bolt

1/2" Washer x 

.116 Thick

3/8" Hex Nut

POST SUPPORT

FIGURE 9

SPIN MAX BEARING 

HOUSE

1/2" x 2" Hex Bolt

(Tension Adjustment Bolt)

FIGURE 10

1/2" Jam Nut

Step 10

 

Install footing pin into Post Support as shown in Figure 8. 

(See Note A)

Step 11 

 

Attach Post Support to Spin Max Bearing House as 

shown in Figure 9 and place Spin Max Tower

into footing hole. (See Notes A & B)

Step 12

 

Fully tighten all fasteners according to the 

"TIGHTENING TORQUE FOR HARDWARE" 

section of the Installation Manual.

Step 13

 

Plumb and level entire component. Pour concrete 

into footing hole. Allow at least 72 hours to cure 

before proceeding to next step. (See Note B)

Step 14

 

Affix "Top of Surfacing" label to base of Spin Max Tower 

indicating the top of minimum required surfacing depth.

(See Note E)  

Step 15

 

To set brake tension, remove Cover Panel Halves, loosen 1/2" 

Jam Nuts and adjust all Tension Adjustment Bolts by 1/4 turn 

as shown in Figure 10. Test number of revolutions per minute. 

Tighten or loosen bolts evenly using 1/4 turn increments. 

Tighten 1/2" Jam Nuts when brake tension is properly set. 

(See Note C)

NOTE: 

Do not over tighten Tension Adjustment Bolts.

If any questions or concerns arise during the installation 

or maintenance of the Spin Max brake, please contact the 

factory and ask to speak to a customer service representative 

at 

1-800-333-8519

.

Summary of Contents for PC-2476

Page 1: ...7 standards The maximum rotations per minute for Spin Max events shall be no greater than 31 Test with the applied force of a male adult between the ages of 18 to 34 150 lbs 68 kgs to 190 lbs 86 kgs a...

Page 2: ...d Soil Top of Surfacing Label C P I P TILE Footing Detail Varies 3 3in DETAIL C SCALE 1 12 Finish Grade Top of Soil Optional Filter Fabric over Pea Gravel for drainage Concrete Footing P I P TILE SURF...

Page 3: ...MAX TOWER INSTALLATION INSTRUCTIONS Rev G 2 18 2021 PC 2476 Page 3 of 9 72 72in Refer to current ASTM 1487 standards The Use Zone for Rotating Play equipment shall be no less than 72 1829mm in all di...

Page 4: ...RM 3 8 Thin Lock Nut 3 8 x 7 8 O D Washer 3 8 x 2 1 4 Button Head Bolt 3 8 x 7 8 O D Washer 1 3 8 x 5 8 THICK NYLON WASHER 2 1 2 WHEEL 1 3 8 x 5 8 THICK NYLON WASHER Step 4 Factory Assembled Attach 2...

Page 5: ...UBLE SEAL BALL BEARING SNAP RING SPIN MAX BEARING HOUSE SPIN MAX BASE TOWER POST 3 8 x 1 O D Washer 3 8 Lock Nut Step 5 Factory Assembled Insert Tower Post through Spin Max Base and attach to Spin Max...

Page 6: ...D Washer 3 8 x 1 11 16 Button Head Bolt 3 8 x 3 4 Button Head Bolt 3 8 x 7 8 O D Washer 3 8 Thin Lock Nut 3 8 x 1 3 8 Barrel Nut 1 2 SAE Washer TOP TRIM BOTTOM TRIM 3 8 x 1 O D Washer 3 8 x 1 1 2 But...

Page 7: ...HTENING TORQUE FOR HARDWARE section of the Installation Manual Step 13 Plumb and level entire component Pour concrete into footing hole Allow at least 72 hours to cure before proceeding to next step S...

Page 8: ...Top Plate Trim Bottom 1 EE 0228 TOP Spin Max Top Plate Trim Top 1 FS PC2476 BHS Spin Max Bearing House 1 FS PC2476 LTR Speed Limiter Arm 3 FS PC2476 PST Spin Max Tower Post 1 FS PC2476 RNG Spin Max S...

Page 9: ...d 3 8 thick steel plug and 3 16 thick steel clevis and will have a multi stage baked on powder coat finish SPEED LIMITER BASE Shall be fabricated using 1 4 thick steel plate with welded 3 16 thick ste...

Reviews: