www.playcraftsystems.com
For Customer Service Call
800.333.8519 (U.S.A.) or 541.955.9199 (International)
SPIN MAX TOWER
INSTALLATION INSTRUCTIONS
Rev G
2/18/2021
PC-2476
Page 6 of 9
3/8" x 3-3/4"
Button Head Bolt
3/8" x 1-1/4" O.D.
Washer
SUPPORT RING
SPIN MAX BASE
PLUG
TOWER NET
Figure 1.2
Figure 1.1
TOWER POST
TOWER NET
CLEVIS
3/8" x 7/8" O.D.
Washer
3/8" x 1-11/16"
Button Head Bolt
3/8" x 3/4" Button
Head Bolt
3/8" x 7/8" O.D.
Washer
3/8" Thin Lock
Nut
3/8" x 1-3/8" Barrel Nut
1/2" SAE Washer
TOP TRIM
BOTTOM TRIM
3/8" x 1" O.D.
Washer
3/8" x 1-1/2"
Button Head Bolt
FIGURE 7
TOWER POST
Step 7
(Factory Assembled)
Connect Tower Net to Tower Post as shown
in Figure 1.1. (See Note A)
Step 8
(Factory Assembled)
Attach Support Ring and Tower Net to Spin
Max Base as shown in Figure 1.2. (See Note A)
Step 9
(Factory Assembled)
Attach Top and Bottom Trim to Tower Post
as shown in Figure 7. (See Note A)