SPIN MAX TOWER
INSTALLATION INSTRUCTIONS
Rev G
2/18/2021
PC-2476
Page 2 of 9
45"
45in
*
36"
36in
36"
36in
MIN. 9"
(See Note D)
LOOSE FILL
Footing Detail
Footing Pin
Blocking, see
Installers Manual
Concrete Footing
2b Stone, drain rock
Optional Filter Fabric over
Pea Gravel (for drainage)
(Finish Grade)
LOOSE FILL SURFACING
MATERIAL SHOWN:
9" compressed or 12"
uncompressed depth.
Compressed depth shown.
(See Note E)
(Top of Soil)
Undisturbed Soil
Top of Surfacing Label
C
P.I.P. / TILE
Footing Detail
Varies
3"
3in
**
DETAIL C
SCALE 1 : 12
(Finish Grade)
(Top of Soil)
Optional Filter Fabric over
Pea Gravel (for drainage)
Concrete Footing
P.I.P. / TILE
SURFACING MATERIAL
Step 1
Refer to Footing Layout and mark
footing hole location. Dig (1) Ø 36"
footing hole. Refer to Footing
Detail for depth and details.
IMPORTANT:
For areas with soft
soil conditions, larger footings may
be required.
* Footing depth must be adjusted
to compensate for the
depth/thickness requirements of
selected safety surfacing. See
Section 06.1 of the Installation
Manual.
** For P.I.P. / Rubber Tile Surfacing footing depth
must be adjusted to ensure Leg Hardware and
Speed Limiter Cover are accessible for maintenance.