background image

IMPORTANT NOTES: Read First

www.playcraftsystems.com

For Customer Service Call

800.333.8519 (U.S.A.) or 541.955.9199 (International)

SPIN MAX TOWER

INSTALLATION INSTRUCTIONS

Rev G

2/18/2021

PC-2476

Page 1 of 9

See Footing Detail

Figure 1.1 

Figure 1.2

FIGURE 1

Spin Max Tower

(A)

 Use liquid thread lock (such as Loctite

®

) with all threaded hardware. 

Important:

 Liquid thread lock (prior to 

curing) helps to eliminate the common problem of "thread seizure" in stainless steel hardware by serving as a 

lubricant during assembly.

(B)

 Do not pour concrete until the equipment is completely assembled, leveled and plumbed. Concrete must 

be allowed to cure completely before using the equipment (at least 72 hours).

(C) 

IMPORTANT:

 Initial brake adjustment must be set and periodically maintained to limit the speed of 

revolutions. Refer to current ASTM 1487 standards. The maximum rotations per minute for Spin Max events 

shall be no greater than 31. Test with the applied force of a male adult between the ages of 18 to 34, 150 lbs. 

[68 kgs.] to 190 lbs. [86 kgs] and 68" [1727 mm] to 73" [1854 mm] tall. If any questions or concerns arise 

during the installation or maintenance of the Spin Max brake, please contact the factory and ask to speak to a 

customer service representative at 

1-800-333-8519

.

(D)

 Minimum distance of the underside outer edge should be 9" [230 mm] or greater above protective surface.

(E)

 An appropriate energy absorbing safety surface is required under and around all playground equipment. 

Loose fill protective surfacing is shown only as an example for the purpose of this assembly instruction. Other 

surfacing material may vary in thickness and/or compression depths. See free publication - The Handbook for 

Public Playground Safety, Publication #325 at www.cpsc.gov for the surfacing appropriate for the fall height of 

the equipment or consult your surfacing supply representative.

Summary of Contents for PC-2476

Page 1: ...7 standards The maximum rotations per minute for Spin Max events shall be no greater than 31 Test with the applied force of a male adult between the ages of 18 to 34 150 lbs 68 kgs to 190 lbs 86 kgs a...

Page 2: ...d Soil Top of Surfacing Label C P I P TILE Footing Detail Varies 3 3in DETAIL C SCALE 1 12 Finish Grade Top of Soil Optional Filter Fabric over Pea Gravel for drainage Concrete Footing P I P TILE SURF...

Page 3: ...MAX TOWER INSTALLATION INSTRUCTIONS Rev G 2 18 2021 PC 2476 Page 3 of 9 72 72in Refer to current ASTM 1487 standards The Use Zone for Rotating Play equipment shall be no less than 72 1829mm in all di...

Page 4: ...RM 3 8 Thin Lock Nut 3 8 x 7 8 O D Washer 3 8 x 2 1 4 Button Head Bolt 3 8 x 7 8 O D Washer 1 3 8 x 5 8 THICK NYLON WASHER 2 1 2 WHEEL 1 3 8 x 5 8 THICK NYLON WASHER Step 4 Factory Assembled Attach 2...

Page 5: ...UBLE SEAL BALL BEARING SNAP RING SPIN MAX BEARING HOUSE SPIN MAX BASE TOWER POST 3 8 x 1 O D Washer 3 8 Lock Nut Step 5 Factory Assembled Insert Tower Post through Spin Max Base and attach to Spin Max...

Page 6: ...D Washer 3 8 x 1 11 16 Button Head Bolt 3 8 x 3 4 Button Head Bolt 3 8 x 7 8 O D Washer 3 8 Thin Lock Nut 3 8 x 1 3 8 Barrel Nut 1 2 SAE Washer TOP TRIM BOTTOM TRIM 3 8 x 1 O D Washer 3 8 x 1 1 2 But...

Page 7: ...HTENING TORQUE FOR HARDWARE section of the Installation Manual Step 13 Plumb and level entire component Pour concrete into footing hole Allow at least 72 hours to cure before proceeding to next step S...

Page 8: ...Top Plate Trim Bottom 1 EE 0228 TOP Spin Max Top Plate Trim Top 1 FS PC2476 BHS Spin Max Bearing House 1 FS PC2476 LTR Speed Limiter Arm 3 FS PC2476 PST Spin Max Tower Post 1 FS PC2476 RNG Spin Max S...

Page 9: ...d 3 8 thick steel plug and 3 16 thick steel clevis and will have a multi stage baked on powder coat finish SPEED LIMITER BASE Shall be fabricated using 1 4 thick steel plate with welded 3 16 thick ste...

Reviews: