Assembly Plan
Surfacing
Material
2'' Below
Grade
2'' Above
Grade
SLIDE
STAKE
(2)
1-1/4'' screws
[PF 3583]
2'' x 4'' x 17-1/4''
Fig. 31b
Fig. 31c
1
2
3
4
5
6
7 8 9
10
11
Fig. 31a
(11)
5/16'' loc-nut
(11)
5/16'' x 3/4''
hex head
bolt
(22)
5/16'' flat washers
1-1/4'' screw
Summit Slide Installation.
1.
Align Summit slide sections together on the ground. Begin attaching two Summit slide sections together by securing the two
outer most bolts in place finger tight. See
(Fig. 31)
for proper Bolt Sequence. Following this pattern install (1) bolt, (2)
washers and (1) loc-nut per hole as shown in
(Fig. 31a)
. Once all (11) bolts, (22) flat washers and (11) loc-nuts are in
place go back and tighten all hardware with appropriate tools.
2.
Consult
(Fig. 31c)
For proper placement of Summit slide on your unit.
3.
Prepare a level area of ground where the bottom of the slide rests 2" below grade
(Fig. 31b)
.
4.
Mark where the slide’s bottom meets the ground and drive a 2" x 4" x 17-1/4" stake until its top is 2'' above the grade
prepared in Step 3. For reference, see
(Fig. 31b)
.
5.
Attach Summit slide to unit as shown in
(Fig. 31c)
.
(4)
1'' Truss
screws
Fig. 31
1'' Truss Screw
Use truss head screws to
to secure the slide to the
deck.
SLIDE INSTALLATION FOR PB 9230C
and PB 8233