PLATINUM Inverter 13000 TL, 16000 TL, 19000 TL, 22000 TL
Service
72
Installation and operating manual: PLATINUM Inverter 13000 TL, 16000 TL, 19000 TL, 22000 TL
Version 05/2010
Mat. No. 737 576-AB
Phase Balancer
It is possible to set the admissible maximum power (unbalanced load)
and the reaction time according to the specifications of the power
plant operator.
Operating mode
OFF
Î
Switch off Phase Balancer function.
Î
No limit of unbalanced load.
POWER CONTROL
Î
Switch on Phase Balancer function.
Î
The inverter monitors and limits the difference between AC
powers.
ERROR OFF
Î
If one inverter module fails, the inverter will disconnect the other
modules from the mains.
ERROR REDUCE
Î
If one inverter module fails, the inverter limits the AC power of the
other modules to the set unbalanced load.
Key
Function
ST
Select operating mode.
ESC
Back to menu
Main Menu
.
OK
Accept selected operating mode.