10
TECHNICAL SUPPORT: (909) 259-6001
BLSL2250
Mounting Instructions
CONCRETE PAD
1. Follow the local building code to determine the requirement of the concrete pad.
2. We recommend the Pad measurements should be at least 28" long, 20" wide,
and 24" deep to ensure the stable operation of the operator, and a minimum
of 4" above level grade to avoid any flooding of the operator.
3. To support the weight of the gate, we recommend the path of the track should be
at least 10" wide and 6" deep.
Drill for a
1
/
2
" x 3
1
/
2
"
Red Head Anchor
(4) Places
20"
24"
10"
6”
Track
2"
9
1
/
4
"
Minimum
4"
Minimum
28"
20
3
/
8
"
4"
Gate Operator Concrete Pad
Gate Operator Concrete Pad
Install a
Positive Stop
at Both Ends
of the Track
Operator Cover
Track Concrete Pad
Track Concrete Pad
Gate
Grade Level
See Note 2
Operator Chassis
12
7
/
8
"
Chain
6"
BLSL2250 Manual_Layout 1 2/10/2014 4:40 PM Page 12
Summary of Contents for BLSL2250
Page 1: ...BLSL2250 BLSL2250 Manual_Layout 1 2 10 2014 4 40 PM Page 1 ...
Page 2: ...BLSL2250 Manual_Layout 1 2 10 2014 4 40 PM Page 2 ...
Page 33: ...BLSL2250 Manual_Layout 1 2 10 2014 4 40 PM Page 33 ...
Page 34: ...BLSL2250 Manual_Layout 1 2 10 2014 4 40 PM Page 34 ...
Page 35: ...BLSL2250 Manual_Layout 1 2 10 2014 4 40 PM Page 35 ...