
12) REDUCE THE RISK OF UNINTENTIONAL STARTING. Make sure switch is in off
position before plugging in.
13) USE THE RECOMMENDED MATERIALS AND REPLACEMENT PARTS. Listing of
recommended material and replacement parts is found in this operating manual. The
use of improper material and replacement parts may result in malfunction and
possible risk of injury, in addition to voiding the warranty.
14) CHECK DAMAGED PARTS. Before further use of the machine, any part that is
suspected of damage should be carefully checked to determine that it would operate
properly and perform its intended function. Check for alignment of moving parts,
binding of moving parts, breakage of parts, mounting, and any other conditions that
may affect its operation. A part that is damaged should be properly repaired or
replaced.
15) NEVER LEAVE MACHINE RUNNING UNATTENDED. Turn the power off, and do
not leave machine until it comes to a complete stop.
16) NEVER ALLOW UNTRAINED USERS TO RUN THIS MACHINE.
17) IF YOU ARE UNSURE OF THE INTENDED OPERATION, STOP USING THE
MACHINE. Seek technical assistance or instruction from trained personnel or
manufacturer service department.
SECTION I: General Information
S
AFETY
I
NSTRUCTIONS
Page 7
Summary of Contents for XL2
Page 2: ......
Page 13: ...Page 13 SECTION III Operation A B F D P N E J M I K L H C G PRODUCT STAGES ...
Page 16: ...Page 16 BRAKE ASSEMBLY STANDARD Small Brake Arm Option A SECTION III Operation ...
Page 19: ...Page 19 SECTION III Operation B C D LOADING TWIST TIE MATERIAL ...
Page 21: ...SECTION III Operation Page 21 CHUTES AND RIBBON GUIDE Length of Chutes Images not to scale ...
Page 23: ...SECTION III Operation TYING ADJUSTMENTS D E B F A C Page 23 ...
Page 36: ...Page 36 APPENDIX A EXPLOSION CHART ...
Page 37: ...Page 37 APPENDIX A CASE COVER ...
Page 40: ...APPENDIX B ELECTRICAL SYSTEM DETAILS Page 40 ...