
1) Support the product to be twist tied with both hands and insert into the left side of the tying
area when tying in the vertical position.
*Insert into the bottom of tying area when in the horizontal tying position.
2) Hold the product in place until the product is twist tied. Tying cycle is approximately
3 seconds.
3) The product may be removed from the tying area any time after the tying cycle is complete.
*
Periodically, the ribbon length will need to be either lengthened or shortened.
Slightly turn the Tying Diameter Adjustment Dial to the left to decrease ribbon length
and to the right to increase ribbon length
. (See Page 22)
*Always remove any ribbon pieces from the XL2 before tying.
SECTION III: Operation
Page 20
T
YING
O
PERATION
Summary of Contents for XL2
Page 2: ......
Page 13: ...Page 13 SECTION III Operation A B F D P N E J M I K L H C G PRODUCT STAGES ...
Page 16: ...Page 16 BRAKE ASSEMBLY STANDARD Small Brake Arm Option A SECTION III Operation ...
Page 19: ...Page 19 SECTION III Operation B C D LOADING TWIST TIE MATERIAL ...
Page 21: ...SECTION III Operation Page 21 CHUTES AND RIBBON GUIDE Length of Chutes Images not to scale ...
Page 23: ...SECTION III Operation TYING ADJUSTMENTS D E B F A C Page 23 ...
Page 36: ...Page 36 APPENDIX A EXPLOSION CHART ...
Page 37: ...Page 37 APPENDIX A CASE COVER ...
Page 40: ...APPENDIX B ELECTRICAL SYSTEM DETAILS Page 40 ...