
P
EDESTAL
S
TAND
A
SSEMBLY
Page 15
SECTION III Operation
1) Lay out all the parts on the floor. Place legs (A&B) with the wheels, parallel to each other as shown
2) Attach the upright (C) to the legs (A&B) using 4 bolts (505D031) and 4 washers (56806)
3) Attach cross bar (D) to the legs using 4 bolts (56426) and 4 washers (56806) to the front of the legs
4) Place the adjustment upright (E) inside the stationary upright (C). The adjustment upright is held in place by
the non-locking spring plunger and secured by the lever clamp.
5) Place the support plate tube (F) inside the tube on the adjustment upright and secure the lever clamp
6) Add the pedestal stand bracket (505D028) to (F) using 4 screws (P001952 ) and 4 washers (P004715 )
7) Screw 4 washers (16614) and 4 Hex Nuts (56507) to secure the bracket to (F)
8) Attach XL2 machine frame (505D173) to top of bracket (505D028) with 4 washers (P004715) and 4 screws
(P002201). Under the bracket attach with 4 washers (P004715) and 4 nuts (56507).
9) Mount the pedestal stand bracket (505D028) with attached XL2 to support plate (F).
Summary of Contents for XL2
Page 2: ......
Page 13: ...Page 13 SECTION III Operation A B F D P N E J M I K L H C G PRODUCT STAGES ...
Page 16: ...Page 16 BRAKE ASSEMBLY STANDARD Small Brake Arm Option A SECTION III Operation ...
Page 19: ...Page 19 SECTION III Operation B C D LOADING TWIST TIE MATERIAL ...
Page 21: ...SECTION III Operation Page 21 CHUTES AND RIBBON GUIDE Length of Chutes Images not to scale ...
Page 23: ...SECTION III Operation TYING ADJUSTMENTS D E B F A C Page 23 ...
Page 36: ...Page 36 APPENDIX A EXPLOSION CHART ...
Page 37: ...Page 37 APPENDIX A CASE COVER ...
Page 40: ...APPENDIX B ELECTRICAL SYSTEM DETAILS Page 40 ...