M0104 E
50
/64
Installation, use and maintenance
ATTENTION
For CUBE MC commissioning, no further power connections are required. All the elec-
tronic components housed in the MC BOX are already wired up and factory tested. It
is therefore NEVER necessary for the installer or station manager to open the MC
BOX except to replace the protection fuses housed on the I/O card (see photo below).
The installer should carry out a plug/socket connection for a quick section-
ing of the electric system in case of failures.
Below are the main connections and the fuses to be replaced by skilled ser-
vice technicians only.
TA
S
TI
E
R
A
1
12
Po
w
er
2
30
V
To
M
ot
or
I /
O
C
ar
d
C
PU
C
ar
d
D
IS
PL
A
Y
C
ar
d
K
EY
R
ea
de
r
1
2
5
3
4
7
6
O
PT
IO
N
A
L
(R
S4
85
+
L
EV
EL
IND
IC
A
TO
R
)
PU
LS
ER
K
60
0
JU
M
PE
R
KE
Y:
1 K
ey r
eader (I-B
utt
on
)
2 D
ispla
y car
d
3 CPU car
d
4 K
eyboar
d
5 I / O car
d
6 J
umper
7 E
lec
trical bo
xes