This chapter describes the installation of the Mosport 1TE/2TE.
Planning the Installation
Before installing the Mosport 1TE/2TE, you should complete the following tasks:
Create a network diagram (see section
“Network Diagram” on page 8
).
Gather IP-related information (see section
“IP-Related Information” on page 8
for more
information).
Install the hardware and software needed to configure the Mosport 1TE/2TE (see section
“Network Information” on page 8
).
Installation Checklist
The installation checklist lists the tasks for installing the Mosport 1TE/2TE. Print a copy of this checklist and
mark the entries as you complete each task. Include the completed checklist in your site log.
Figure 6:
Installation Checklist
Mosport 1TE/2TE name/serial number
_________________________________________________________
Task
Verified By
Date
Network information available & recorded in site log
Environmental specifications verified
Site power voltages verified
Installation site pre-power check completed
Required tools available
Additional equipment available
Mosport 1TE/2TE received
Quick start guide received
Regulatory compliance and safety information received
Warranty card received
Software version verified
Rack, desktop, or wall mounting of chassis completed
Initial electrical connections established
ASCII terminal attached to console port
Cable length limits verified
Initial configuration performed
Initial operation verified
Summary of Contents for Mosport 1E-F
Page 6: ...Contents vi Mosport 1TE 2TE...
Page 10: ...Preface About this Manual Document Conventions x Mosport 1TE 2TE...
Page 32: ...Chapter 3 Powering on the Mosport 1TE 2TE Management Choices 22 Mosport 1TE 2TE...
Page 35: ...Disclaimers Hardware Installation Guide Mosport 1TE 2TE 25 RoHS China...
Page 52: ...Appendix C Standard Hardware Information Warranty 42 Mosport 1TE 2TE...
Page 60: ...Appendix E Glossary Wide Area Network WAN 50 Mosport 1TE 2TE...
Page 62: ...Appendix F List of Acronyms 52 Mosport1TE 2TE...