WARNING
-WHEN THE BATTERY IS REALLY FLAT (WELL BELOW 12.6V) IT MIGHT BE THAT 5 HOURS OF
RECHARGING ARE NOT ENOUGH TO ACHIEVE OPTIMAL PERFORMANCE.
IN THESE CONDITIONS IT IS HOWEVER ESSENTIAL NOT TO EXCEED EIGHT HOURS OF CON-
TINUOUS RECHARGING SO AS NOT TO DAMAGE THE BATTERY ITSELF.
Dry-charge battery
WARNING
THE BATTERY ELECTROLYTE IS POISONOUS AS IT MAY CAUSE SERIOUS BURNS. IT CON-
TAINS SULPHURIC ACID. AVOID CONTACT WITH THE EYES, THE SKIN AND CLOTHING. IF
COMING INTO CONTACT WITH EYES OR SKIN, WASH ABUNDANTLY WITH WATER FOR AP-
PROX. 15 MIN. AND SEEK IMMEDIATE MEDICAL ATTENTION.
IN THE EVENT OF ACCIDENTAL INGESTION OF THE LIQUID, IMMEDIATELY DRINK LARGE
QUANTITIES OF WATER OR MILK, MAGNESIUM MILK, BATTERED EGG OR VEGETABLE OIL.
SEEK IMMEDIATE MEDICAL ATTENTION.
THE BATTERIES PRODUCE EXPLOSIVE GAS; KEEP CLEAR OF NAKED FLAMES, SPARKS OR
CIGARETTES; VENTILATE THE AREA WHEN RECHARGING INDOORS.
ALWAYS WEAR EYE PROTECTION WHEN WORKING IN THE PROXIMITY OF BATTERIES.
KEEP OUT OF REACH OF CHILDREN
Characteristic
Battery
12V-9Ah
Commissioning dry-charge batteries:
1) Once the short closed tube and caps are removed, add sulphuric acid to the elements, of a type for
batteries with a specific gravity of 1.26, corresponding to 30° Bé at a temperature of at least 15°C until
reaching the upper level.
2) Let it sit for two hours.
3) Use the specific battery charger (single or multiple) to charge to an intensity equal to around 1/10 of
the capacity until the voltage has reached a value of around 2.7 V per element. The density of the acid
should be about 1.27, corresponding to 31° Bé, and the values have stabilised. The duration of the
charging operations must be 15 - 20 hours.
4) Once the charging is complete, level out the acid (add
distilled water
or remove excess acid), put
on the caps and clean carefully.
5) Once these operations have been completed, install the battery on the vehicle, correctly following
the connections described in point 3) «
Battery charging
».
WARNING
- ONCE THE BATTERY HAS BEEN INSTALLED IN THE VEHICLE IT IS NECESSARY TO REPLACE
THE SHORT TUBE (WITH CLOSED END) NEAR THE + POSITIVE TERMINAL WITH THE CORRE-
SPONDING LONG TUBE (WITH OPEN END), THAT YOU FIND FITTED TO THE VEHICLE, TO
ENSURE THAT THE GASES THAT FORM CAN ESCAPE PROPERLY.
Specific tooling
020333Y
Single battery charger
020334Y
Multiple battery charger
NRG Power Purejet
Electrical system
ELE SYS - 15
Summary of Contents for NRG POWER PUREJET
Page 1: ...WORKSHOP MANUAL 633265 NRG Power Purejet...
Page 4: ......
Page 6: ......
Page 7: ...INDEX OF TOPICS CHARACTERISTICS CHAR...
Page 17: ...INDEX OF TOPICS TOOLING TOOL...
Page 29: ...INDEX OF TOPICS MAINTENANCE MAIN...
Page 39: ...INDEX OF TOPICS TROUBLESHOOTING TROUBL...
Page 45: ...INDEX OF TOPICS ELECTRICAL SYSTEM ELE SYS...
Page 62: ...Electrical system NRG Power Purejet ELE SYS 18...
Page 63: ...INDEX OF TOPICS ENGINE FROM VEHICLE ENG VE...
Page 65: ...INDEX OF TOPICS ENGINE ENG...
Page 106: ...Engine NRG Power Purejet ENG 42...
Page 107: ...INDEX OF TOPICS SUSPENSIONS SUSP...
Page 116: ...Suspensions NRG Power Purejet SUSP 10...
Page 117: ...INDEX OF TOPICS PURE JET INJECTION INJ PJ...
Page 180: ...pure jet injection NRG Power Purejet INJ PJ 64...
Page 181: ...INDEX OF TOPICS BRAKING SYSTEM BRAK SYS...
Page 189: ...INDEX OF TOPICS COOLING SYSTEM COOL SYS...
Page 195: ...INDEX OF TOPICS CHASSIS CHAS...
Page 200: ...Chassis NRG Power Purejet CHAS 6...
Page 201: ...INDEX OF TOPICS PRE DELIVERY PRE DE...
Page 205: ...INDEX OF TOPICS TIME TIME...