Refitting
To fit, proceed as follows:
- Insert the two pads in the callipers.
- Screw the two pad lock pins to the correct torque, and apply the recommended product.
- Fit the calliper on its support, tightening the two screws to the prescribed torque.
N.B.
IF IT IS NOT POSSIBLE TO CORRECTLY POSITION THE CALLIPER ON THE DISC DURING FIT-
TING, GENTLY EXPAND THE PADS.
Recommended products
Loctite 243
Medium strength threadlock
Loctite 243 medium-strength threadlock
Locking torques (N*m)
Screw tightening calliper to the support
20 ÷ 25
Pad fastening pin
19.6 ÷ 24.5
Rear brake pads
Removal
Proceed as follows:
- Remove the rear brake calliper
- Remove the two pins holding the brake pads.
- Remove the pads, paying attention to the pad re-
taining spring.
- Check the thickness of the pads.
If the thickness is less than the minimum value,
replace the pads with new pads.
Characteristic
Minimum value
1.5 mm
See also
Refitting
Carry out the installation by analogy with the procedure described for the installation of the rear brake
calliper.
- Tighten the two calliper fixing screws to the prescribed tightening torque.
Locking torques (N*m)
Beverly 125
Braking system
BRAK SYS - 197
Summary of Contents for Beverly Tourer 125
Page 4: ......
Page 6: ...INDEX OF TOPICS CHARACTERISTICS CHAR...
Page 22: ...INDEX OF TOPICS TOOLING TOOL...
Page 35: ...INDEX OF TOPICS MAINTENANCE MAIN...
Page 51: ...INDEX OF TOPICS TROUBLESHOOTING TROUBL...
Page 57: ...INDEX OF TOPICS ELECTRICAL SYSTEM ELE SYS...
Page 80: ...INDEX OF TOPICS ENGINE FROM VEHICLE ENG VE...
Page 83: ...INDEX OF TOPICS ENGINE ENG...
Page 142: ...Lubrication Conceptual diagrams LUBRICATION CIRCUIT Engine Beverly 125 ENG 142...
Page 143: ...Beverly 125 Engine ENG 143...
Page 157: ...Remove the maximum nozzle Remove diffuser Beverly 125 Engine ENG 157...
Page 166: ...INDEX OF TOPICS SUSPENSIONS SUSP...
Page 189: ...INDEX OF TOPICS BRAKING SYSTEM BRAK SYS...
Page 203: ...INDEX OF TOPICS COOLING SYSTEM COOL SYS...
Page 204: ...Circuit diagram 125 ENGINE Cooling system Beverly 125 COOL SYS 204...
Page 206: ...Cooling system Beverly 125 COOL SYS 206...
Page 211: ...INDEX OF TOPICS CHASSIS CHAS...
Page 223: ...INDEX OF TOPICS PRE DELIVERY PRE DE...
Page 227: ...INDEX OF TOPICS TIME TIME...
Page 246: ...Frame CHASSIS Code Action Duration 1 004001 Chassis Replacement Time Beverly 125 TIME 246...
Page 264: ...Seat SADDLE Code Action Duration 1 004003 Saddle Replacement Time Beverly 125 TIME 264...
Page 278: ...Tyres 10...