5 Installation
20
Version: 1.4.0
MP148E
N565 NEXACT® Linear Stage
4.
Completely screw in one M3 screw into each of the holes.
5.
Make sure that screw heads do not protrude from the countersunk holes.
6.
Check that the upper positioner is firmly seated.
5.4
Fixing the Load to the N565
NOTICE
Excessively long screws!
Screws inserted too deeply can damage the N-565.
Pay attention to the depth of the mounting holes (p. 36).
Only use screws of the correct length for the respective mounting holes.
Requirements
You have read and understood the general notes on installation (p. 13).
You have fixed the positioner properly (p. 15).
You have prepared the load so that it can be fixed to the mounting holes in the
platform:
−
The gap between the center of gravity of the load and the center of the platform is
as small as possible in all directions.
−
At least two points are provided for fixing the load on the platform.
Tools and accessories
At least two screws of suitable length. Options:
−
M2.5 screws
−
M3 screws
Suitable tool for tightening the screws