5 Installation
N565 NEXACT® Linear Stage
MP148E
Version: 1.4.0
19
Requirements
You have read and understood the general notes on installation (p. 13).
You have accounted for the space required to route cables according to regulations and
without bending them.
You have mounted the lower positioner onto an underlying surface (p. 15) properly.
Tools and accessories
4 M3 screws included in the scope of delivery of the upper positioner (p. 9)
Suitable screwdriver
Building an XY System
Figure 7: Building an XY system from two N-565.260 positioners
1
Upper positioner (platform in reference position) with
a, b, c, d: mounting holes Ø 3.4 mm with counterbore for M3 socket head
screws
2
Lower positioner with
a, b, c, d: M3 mounting holes in the platform
Holes that are aligned during attachment are marked with the same letter.
1.
If necessary: Allow access to the required mounting holes in the base body of the upper
positioner.
−
Start the upper positioner (p. 23) and do a reference move to the reference switch
(refer to the user manual for the controller).
2.
Position the upper positioner rotated by 90° on the platform of the lower positioner
(see above figure).
3.
Put the upper positioner so that the mounting holes in the upper and lower positioner
are in line (holes a to d in the above figure).