Installation
CU458-2
14
93728 1.0
CAUTION
You should only connect and disconnect the cables when they are completely disconnected from
any live current!
Pull out the power supply plug from the plug socket.
Screw the control unit onto the end product (as shown in Figure 6). Use the mounting holes shown
in Figure 5 located on the control unit. Use screws meeting the requirements of DIN 7049 with 4.8
mm diameter and of suitable length (5 mm plus the screw-in depth into the end product).
Proceed with the installation as follows:
1
Mark the drill holes.
2
Drill the two holes for the screws in the end product.
3
Screw in the two screws so the CONTROL UNIT is securely mounted to the end product.
Figure 6
Installing the CONTROL UNIT
1
3
2
Summary of Contents for Dewert Okin CU458-2
Page 2: ......