13
e) Maintenance and Repairs
6 months
Regular visual checks
cracks
fractures
pinching
shearing-off
strain relief
kink protection
damaged connection
leads
the manufacturer
persons qualified
At regular intervals carry out the inspections in accordance with the BGV A3 (Instruction of
the Professional Trade Association). The inspections must be performed by an electrical
specialist.
The recommended inspection period is:
In addition to the above, the following checks should be carried out at shorter intervals:
for damage of all kinds
Check the housing for and and the connection lead for signs of
and . Also check the with , in
particular after each case of mechanical loading. Any
of equipment must be replaced by or
to do so (see page 3) in order to exclude hazards.
Check the limit switches by using the DEWERT control unit to make the drive
travel to the end-of-travel positions.
Regular functional testing of the “Quick Release, GQR”
Regular functional testing of the “Emergency Release, ER”
by actuating the
Bowden cable, as described on page 9,11 and 12.
by actuating the
release lever, as described on page 9 and 10.
Regular checks
of the Bowden cable of the "GQR quick release” at intervals to ensure
that it is functioning correctly. If necessary, re-adjust!
Caution!
For Your Own Safety!
Shutdown in an emergency is achieved by pulling the mains plug out of the drive
controls!
mains plug
at all times
pulled out of the wall socket
MEGAMAT 2
The must therefore be accessible when the system is in operation
to ensure it can be quickly in an emergency.
Movement of the drive takes place via a stroke pipe. Please bear this in mind when
designing your product:
After installing the make sure that no shearing or trap/crush zones are
accessible from the outside.
In the Operating Instructions to be drawn up by yourselves, it is essential that you draw the
operator’s attention to the points mentioned here.
11/2008
ID-Nr. 48148