ENVIRO 6S SLIDING GATE OPERATOR
4
Gate operator
Gear
Groundsill
Input power
Plain washer
Nut
Spring washer
Nut
Fig.2
Operator base (see Fig.3)
After the concrete has hardened, mount the gate operator base to the concrete pad. Verify that the base
is properly leveled.
Using bolts and washers mount the gate operator to the base and insert the cover. Check the operator
and make sure it is lined up with the gate.
Fig.3