5.Pass cable through the cutout provided (at top) and then
pull the same using steel rope from service hatch.
6. Fix the top cover back to
PV Cartridge top as shown.
7a. Open 8 Nos rubber cover and tight
16Nos M6 screws using cross head
screwdriver.
7b. Then affix back the rubber covers
(X8) and rubber caps (X4).
8.Connect male and female MC4 T2
connectors to both PV Cartridge cables
through service hatch.
PV Cartridge
Top
PV Cartridge
Bottom
MC4 connector
T2, Male
MC4 connector
T2, Female
2.5 N.m
P1
torque
2.5 N.m
P1
torque
4.Connect both MC4 connectors of PV cartridge
top cable to the 4m long MC4 extension cable,
then Insert the PV cartridge top to the pole as
shown.
X4
X8
X4
7
X4