2.Fix the PV cartridge with pole using
M8 screws as shown.
3.Open the 8 Nos rubber covers and
tight all M6 screws using cross head
screwdriver. Then affix back the rubber
covers.
2.5 N.m
P1
torque
2.5 N.m
P1
torque
5
6m Pole Assembly (OR)
1.Insert the PV cartridge bottom first and
pass the cable through the cutout given and
then pull the same using steel rope from
service hatch.
3. Unscrew M8 screws, and open top cover
from PV Cartridge Top.
8 N.m
5mm
5mm
torque
8 N.m
5mm
5mm
torque
8 N.m
5mm
torque
W a r n i n g : Wire should be pulled
out properly, don
’t let the wire to
come between mating faces.
2. Fix the PV Cartridge bottom using M8
screws.
X4
X4
6
X4
X4
X4