Check List for Installation
(This checklist MUST be signed by the installer before system installation handover)
Person in charge of site construction
Signature/Date
Project Location
No. Item
Description
Result
Remark
1
Installation
location
If the installation location avoid the
shade of the trees or buildings
□
yes
□
No
2 Base
If structural strength of base meet
local pole specification
□
yes
□
No
3 Anchor bolts
If the anchor bolts location
dimensions follow the MI
□
yes
□
No
4 Products
If all components no damaged
□
yes
□
No
5 Bolts
If four bolts are fixed
□
yes
□
No
6 Wiring
If the wiring is done as per the
instruction
□
yes
□
No
7
Fixing of PV
Cartridge with
Pole
If all the screws are are properly
tightened and rubber bolt cover are
placed over.
□
yes
□
No
8 Work status
If the work status comply to the
request
□
yes
□
No
9 Luminaire
If the luminaire can light on
□
yes
□
No
10 PV panel
If the PV panel can charge the
battery normally.
□
yes
□
No
11
Charger
configuration
If the the charger is configured as
per the customer requirement.
□
yes
□
No
Project Name
Scope of check
Site Consrtuctor
10