ELECTRICITY
49
Reproduction or translation, even partial, is forbidden without the written consent of Peugeot Motocycles
Checking the ignition system
Disconnect the ignition unit and take the
measurements on the harness side.
• Between the green wire and the ground: 0
:
• Between the yellow/black wire and the
ground (Primary high voltage coil): 0.2
:
±20%
.
• Between the green/black wire and the
ground (Ignition sensor) : 115
:
±20%
.
• Between the black wire and the ground,
ignition on: 12 V (Battery voltage).
- If the values are correct, replace the ignition
module.
- If the values are incorrect, check:
• The ignition switch.
• The harness.
• The high voltage coil.
Primary: 0.2
:
±20%
.
Secondary: 5
:
±20%
.
• The suppressor: 5 k
:
±20%
.
• The ignition sensor
Between the green/black wire and the ground:
115
:
±20%
.
Fuel gauge
- Remove the footboard. See: Procedure 7
page 24.
- Disconnect the fuel gauge (1).
- Remove the fuel gauge (4 screw).
- Remove the rubber gasket.
When re-installing, use a new gasket.
Fuel gauge check
- Check the resistance between the terminals
depending on the upper and lower positions of
the float.
A. Full fuel tank: 10
:
±20%
.
B. Empty fuel tank: 95
:
±20%
.
Ω
1
Ω
A
B
Summary of Contents for SPEEDFIGHT 3 RS
Page 1: ...Sales division Technical network leadership WORKSHOP MANUAL ...
Page 2: ......
Page 59: ......