FUEL SYSTEM
52
Reproduction or translation, even partial, is forbidden without the written consent of Peugeot Motocycles
- Remove the idle jet (6).
- Remove the main jet (7).
- Remove the needle well (8).
Check the condition of the needle
valve and the needle valve seat (A).
Check the condition of the float
chamber O-ring.
Removal of the mixture screw
- Turn clockwise the mixture control screw (1)
while counting the number of turns until it is
screwed home.
When re-fitting, this operation
allows you to put it back to its initial
adjustment position.
6
7
8
A
1
Summary of Contents for SPEEDFIGHT 3 RS
Page 1: ...Sales division Technical network leadership WORKSHOP MANUAL ...
Page 2: ......
Page 59: ......