OPERATION
3
page 3.1
RCP–48X
Section 3
Operations
3.1 Operations of the RCP–48X
Introduction
The RCP–48X is controlled by the RC5500 Controller. Operations of the
RCP–48X require that it be configured at the controller and have the
appropriate polling address assigned. Connections and power up proce-
dures should be performed on each panel controlled.
General
All RCP–48X panels in a routing switcher system are custom configured
at the factory prior to shipment. The information needed to configure the
panels comes from the System Design Guide filled out by the customer.