Perrot VP3 VAC Maintenance And Operating Instructions Download Page 29

 

 

TDP074e.doc

 

Rev.

 

28.11.2016

 

Page

 

29

 

/

 

29

 

 

Perrot

 

REGNERBAU

 

CALW

 

GmbH

     

Industriestraße

 

19

29

  

/

  

D

75382

 

Althengstett

 

/

 

Germany

 

                                                                 

Tel.:

 

+49

7051

162

0

 

/

 

Fax:

 

+49

7051

162

133

 

                                                                 

E

mail:

 

[email protected]

 

 

/

 

Construction

 

team

 

e

mail:

 

[email protected]

 

CE

 

declaration

 

of

 

conformity

 

 

 

In

 

compliance

 

with

 

Machinery

 

Directive

 

(98/37/EC),

 

appendix

 

II

 

A

 

In

 

compliance

 

with

 

EC

 

Low

 

Voltage

 

Directive

 

(73/23/EEC)

 

In

 

compliance

 

with

 

EC

 

Directive

 

on

 

Electromagnetic

 

Compatibility

 

(89/336/EEC)

 

 
 

The

 

manufacturer:

   

Regnerbau

 

Calw

 

GmbH

 

               

Industriestrasse

 

19

29

 

               

75382

 

Althengstett

 

 

Germany

 

               

Tel.

 

+49

(0)7051

162

0

 

 
 

herewith

 

declares

 

that

 

the

 

following

 

product

 

 

Product

 

name:

     

VP3

 

large

area

 

pop

up

 

sprinkler

 

Year

 

made:

        

from

 

2014

 

 

conforms

 

with

 

the

 

provisions

 

of

 

the

 

directives

 

indicated

 

above.

 

 
 

The

 

following

 

harmonised

 

standards

 

were

 

applied:

 

 

DIN

 

EN

 

292

1;

  

Safety

 

of

 

Machinery

 

 

Basic

 

terms,

 

general

 

EN

 

12100

  

design

 

principles;

 

part

 

1:

 

General

 

principles

 

and

 

specifications

 

 

DIN

 

EN

 

1050

 

 

Machine

 

safety;

 

guidelines

 

for

 

risk

 

assessment

 

 

DIN

 

EN

 

60204

1

 

Machine

 

safety;

 

electrical

 

equipment

 

of

 

machines;

 

part

 

1:

 

General

 

requirements

 

(IEC

 

204

1:1992,

 

modified)

 

 

Original

 

versions

 

of

 

the

 

operating

 

instructions

 

for

 

the

 

machine

 

and

 

of

 

the

 

technical

 

documentation

 

have

 

been

 

provided.

  

This

 

declaration

 

of

 

conformity

 

loses

 

its

 

validity

 

if

 

any

 

modifications

 

are

 

made

 

to

 

the

 

machine

 

that

 

we

 

have

 

not

 

first

 

agreed

 

and

 

approved

 

in

 

writing.

 

 

Althengstett,

  

 
 

_____________

       

_____________________________________

     

__________________

 

        

Date

   

 

 

 

Signatory

 

and

 

signatory's

 

details

   

 

           

 

 

 

 

Signature

 

20.05.2014

 

Günther

 

Flik,

 

Director

 

of

 

Engineering

Summary of Contents for VP3 VAC

Page 1: ...BAU CALW GmbH Industriestra e 19 29 D 75382 Althengstett Germany Tel 49 7051 162 0 Fax 49 7051 162 133 E mail perrot perrot de Construction team e mail technik perrot de Maintenance and Operating Inst...

Page 2: ...S ON THE SIDE OF THE IRRIGATED AREA 5 4 INSTALLATION SCHEME FOR VP3 WITH RUBBER INFILL LAWN 9 5 4 1 HANDLING THE VP3 POP UP SPRINKLER WITH FILLED SYNTHETIC TURF 11 5 4 2 OPERATING INSTRUCTIONS FOR VP3...

Page 3: ...operating instructions contain some fundamental instructions that must be followed when installing operating servicing and maintaining the sprinkler It is therefore imperative that these instructions...

Page 4: ...tion of the pop up sprinkler by unauthorised personnel if the control unit is freely accessible Operation of the sprinkler with the sector to be watered wrongly set e g as the result of vandalism This...

Page 5: ...il perrot perrot de Construction team e mail technik perrot de 3 Description 3 1 View from above 3 2 Side view Jet direction Cover for cable compartment Securing screw Manual ON OFF Auto control modul...

Page 6: ...d replace retaining ring RT17844 VP3 valve lifter Remove valve RT25359 Face hole key Piston motor cover ZB98236 VP3 flush insert Flush main line RB25380 VP3 assembly key for nozzle Changing nozzle RB2...

Page 7: ...njury Therefore make sure that the installation has been fully completed before turning on the water supply 5 2 Installation instructions The thread connection on the pop up sprinkler is 2 FT For the...

Page 8: ...PE Hauptleitung dia PE Main Pipe 110 90 75 1 T St ck 90 110 x 4 IG T piece 90 110 x 4 FT ZH90159 1 T St ck 90 90 x 3 IG T piece 90 90 x 3 FT ZH90158 1 T St ck 90 75 x 2 IG T piece 90 75 x 2 FT ZH9015...

Page 9: ...any Tel 49 7051 162 0 Fax 49 7051 162 133 E mail perrot perrot de Construction team e mail technik perrot de Sprinkler arrangement schematic only Detail X Sprinkler arrangement upon installation VP3 s...

Page 10: ...Perrot REGNERBAU CALW GmbH Industriestra e 19 29 D 75382 Althengstett Germany Tel 49 7051 162 0 Fax 49 7051 162 133 E mail perrot perrot de Construction team e mail technik perrot de 5 4 Installation...

Page 11: ...aft cover can be disassembled assembled see 8 6 Do not plug the drainage holes during adhesive bonding of the synthetic turf 5 4 2 Operating instructions for VP3 pop up sprinkler with filled synthetic...

Page 12: ...e area to be watered The key operated switch gets fitted in a position from which the whole danger zone can be clearly seen Watering begins only when the operator gives the all clear by turning the ke...

Page 13: ...or connecting the control cable to the coil fitted inside the sprinkler Open the cover of the cable compartment and attach cable connector Put back the cables into the cable compartment and close the...

Page 14: ...Fax 49 7051 162 133 E mail perrot perrot de Construction team e mail technik perrot de Cable plan schematic only Control cable specification Suitable for underground installation PVC insulated and EP...

Page 15: ...he sprinkler is being operated in automatic mode there must be nobody present in the area Operating personnel must not stand in the direction of the sprinkler s jet The jet s direction is marked on th...

Page 16: ...t has no power c Slowly open supply of water to the sprinkler until operating pressure is built up It is possible that the sprinkler will briefly open but should then automatically close after at most...

Page 17: ...arried out with the sprinkler running First fold out the safety catch to the side of the sprinkler head see illustration 2 so that no limbs e g fingers can get jammed if the sprinkler should unexpecte...

Page 18: ...k perrot de 6 3 Setting the sector With this pop up sprinkler the sector setting is infinitely variable You can adjust the area to be watered by pulling on the relevant end of the top or bottom spring...

Page 19: ...pring stop apart at both ends only to such extent that they can just be slid off If the spring stops get overextended it will not be possible to use them any more for back and forth operation Gently p...

Page 20: ...g the regulating screw to the right reduces the rotational speed Option It is possible for the sprinkler to be completely stopped when the speed regulating screw is turned to the right If you turn it...

Page 21: ...g If the sprinkler is taken back into use despite there still being ice in the piston chamber then at an ice temperature of approx 20 C it will take around 15 minutes until the drive is thawed out Ele...

Page 22: ...approx 10Nm of torque That means with a lever length of 10cm you need to apply a force of 100N to the spanner Note After the third or fourth winter there should be no further expansion Marker points B...

Page 23: ...r one year of use tighten the M6 flange screws 8 of them using a 10mm box spanner to ensure that the sprinkler module is fixed firmly in place Tightening torque 9 1 Nm Clean out the inside of the spri...

Page 24: ...zle to be easily loosened by hand using the assembly key RB25189 and just as easily tightened again Wrong position Right position When fitting the nozzle make sure that the funnel gets pushed on in th...

Page 25: ...out of the housing in order to carry out the repairs described below Unscrew cover using 5mm Allen key Remove the 8 flange screws using a 10mm box spanner Figure 6 Pull sprinkler module out of the ho...

Page 26: ...alve insert can be slightly lubricated with oil or grease Insert the valve down into the guide housing by applying some gentle taps Using pliers RT17844 now fit the retaining ring into the groove prov...

Page 27: ...ess back the mounting ring at the plug in connector and pull out the hose Fitting the control unit When buying a replacement part the control unit is supplied with plug and socket connections Push hos...

Page 28: ...facturer Valve opens closes only with manual opening but not on any electric signal Screw for Manual opening is set to OFF Turn screw to the left as far as it will go to Auto Core is jammed in the coi...

Page 29: ...conforms with the provisions of the directives indicated above The following harmonised standards were applied DIN EN 292 1 Safety of Machinery Basic terms general EN 12100 design principles part 1 G...

Reviews: