
TDP074e.doc
Rev.
28.11.2016
Page
24
/
29
Perrot
REGNERBAU
CALW
GmbH
Industriestraße
19
‐
29
/
D
‐
75382
Althengstett
/
Germany
Tel.:
+49
‐
7051
‐
162
‐
0
/
Fax:
+49
‐
7051
‐
162
–
133
E
‐
mail:
/
Construction
team
e
‐
mail:
When
changing
the
main
nozzle
the
nozzle's
thread
should
be
cleaned
and
greased.
This
enables
the
nozzle
to
be
easily
loosened
by
hand
(using
the
assembly
key
RB25189)
and
just
as
easily
tightened
again.
Wrong
position
Right
position
When
fitting
the
nozzle
make
sure
that
the
funnel
gets
pushed
on
in
the
right
position.
(See
picture.)
If
the
funnel
is
not
properly
fitted
first,
the
nozzle
cannot
be
screwed
into
the
manifold
head.
When
fitting
the
new
nozzle,
make
sure
that
the
nozzle
gets
fully
screwed
in,
that
the
main
secondary
nozzle
points
downwards
(6
o'clock
position)
and
that
the
sealing
ring
is
correctly
fitted
(figure
5).