![PerkinElmer TORION T-9 User Manual Download Page 67](http://html1.mh-extra.com/html/perkinelmer/torion-t-9/torion-t-9_user-manual_1530242067.webp)
Performance Validation . 63
Performance Validation
Refer also to the
Performance Validation
section located in the Chromion software chapter.
Purpose of a Performance Validation (PV):
To calibrate the instrument to display the correct masses.
To calibrate the retention times of the peaks for better unknown compound detection.
Verify instrument performance:
•
Sensitivity
•
Mass resolution
•
Chromatographic performance
•
Mass range
•
Compound identification
•
GC retention time
1.
Verify appropriate System and SPME blanks have been performed. See the “
System Blank
”
and “
SPME Blank
” sections of this chapter.
2.
On the home screen, open the drop-down box for
Analysis Type
and select
Performance
Validation
.
3.
Insert the Custodion syringe needle into the CALION Performance Validation vial.
CAUTION
ATTENTION
Be careful not to bend the flexible SPME needle w hen inserting
into the vial.
Veillez à ne pas plier l'aiguille SPACE flexible lors de l'insertion
dans le flacon.
4.
Depress the Custodion plunger to extend the fiber into the CALION PV vial and take a sample.
Summary of Contents for TORION T-9
Page 1: ...TORION T 9 Gas Chromatograph Mass Spectrometer GC MS User s Guide GC MS...
Page 4: ...iv Torion T 9 User s Guide...
Page 10: ...6 Torion T 9 User s Guide...
Page 11: ...1 Introduction...
Page 15: ...2 Safety Practices...
Page 24: ...20 Torion T 9 User s Guide...
Page 31: ...3 System Overview...
Page 40: ...36 Torion T 9 User s Guide...
Page 41: ...4 Basic Custodion Operations...
Page 49: ...5 Basic Operation...
Page 116: ...112 Torion T 9 User s Guide...
Page 117: ...6 Software...
Page 257: ...7 Advanced Operations...
Page 260: ...256 Torion T 9 User s Guide...
Page 261: ...8 Maintenance...
Page 268: ...264 Torion T 9 User s Guide...
Page 269: ...9 Troubleshooting...