CB 240 Climbing Formwork
Instructions for Assembly and Use – Standard Configuration
B2 Assembly of the Formwork Elements
VARIO GT 24 Element
Moving of VARIO GT 24 Elements
Preparation for Initial Assembly
1. Retract Carriage (2) and secure with
wedge (2.2).
2. Mount Strongback CB (4) to Carriage
using bolts Ø 25 x 180 and cotter pins
(4.6).
3. Attach Adjustable Brace (3.1) to
Strongback using bolts Ø 25 x 180 and
cotter pins (3.2) and laterally brace
Strongbacks, see C1 Connecting Adju-
stable Brace.
Assembly
4. Check that the Height Adjusting Unit
(4.3) is in the correct position and
adjust if necessary.
5. Lower formwork (10) with the bottom
waler (10.4) onto the Height Adjusting
Unit. Lifting gear remains tensioned.
6. Mount Waler Fixation (4.4) to the walers.
(Fig. B2.11)
Detach crane lifting gear.
7. Move Carriage (2) with formwork
forwards to the wall. Secure Carriage
with wedge (2.2).
8. Align formwork. (Fig. B2.12)
Attention must be paid to ensure that
the Strongback does not collide with the
Scaffold Bracket GB 80 or decking. If
necessary, reposition Scaffold Bracket
and form recess in the decking.
Fig. B2.11
Fig. B2.12
AuV CB 240 EX.indb 45