Quick.us /
Performance Variable 25
18
18
#7
Split the nose 3 by 3 and grasp the lower
3 T-seams at the leading edge in your right
hand. Grasp the 7 T-seams directly above the
A lines with your left hand. Pull tension
against the rig to be sure the A-lines are
straight, and then fold the lower 3 leading
edge parts back under the canopy so the A-
line path is on the far right as you look from
the canopy top toward the rig.
The upper three leading edge parts are now
facing to the right.
#8
Hold down the canopy at the A-line
path, find the 7 T-seams directly above the B-
line path and fold to the right. Place the B/C-
line group on top of the A-lines. The material
between the A and B lines should now be in a
fold to your left of the A/B line paths.
#9
Hold down the canopy at the B-line
path and grab the 7 T-seams directly on top
of the C-line path. Fold the C-lines to the
right past the B-line path as far as possible,
then bring them back and lay the C-lines on
top of the B-lines. This results in the canopy
fabric between the B and C-lines being folded
on the right side of the canopy and the C-
lines are directly on top of the B-lines.
Straighten this fold as necessary.
#10
Now
grasp the steering lines where
they attach to the tail, pull the entire tail out
and drop it straight down. Split the tail at the
center cell and half flake the tail so there are
five folds on each side from the bottom up.
Lay the center cell of tail on top. It should be
spread out to the same width as the rest of
the folded canopy. Make sure that the nose
of the canopy is still split 3 by 3 to the left and
to the right.
Summary of Contents for Quick 113
Page 6: ...Quick us Performance Variable 6 1b...
Page 7: ...Quick us Performance Variable 7 1c...
Page 12: ...6 Parts List 12...