2.5. Fuel
Wood pellet is a primary fuel used in the KSR Beta Pelet: PN-EN
ISO 17225-2:2014 – class A1. Fuel used for combustion in the
pellet-
fi
red boiler should have su
ffi
cient calori
fi
c value > 17 MJ/
kg, be dried (moisture content ~ 10%) and have size recom-
mended by the producer (6±1 mm and 8 ±1 mm). Use of moist
or too large fuel can lead to locking in the feeder and serious
failure of the boiler. Ash content should be lower than 0.5%,
the unfavourable chemical composition of the fuel can result in
sintering and formation of large amounts of dust and soot and
increased fuel consumption. Times given in the table on page 14
apply only to operation with suitable fuel.
2.6. Equipment
Prior to the boiler setting you should check the presence of addi-
tional tools and operation of the instrumentation. The complete
set should include: burner with a feeding system, fuel container,
electronic controller, brush, hook, ash shovel, drain cock, fuel
swirlers.
3. BEFORE START-UP
3.1. Boiler room
• It should be a separate room with height not lower than 2.2
m in the newly constructed building (in the already existing
buildings the allowable height equals to 1.9 m).
• It should have arti
fi
cial lighting installed and have natural
lighting as far as practicable.
• It should have gravity ventilation in good working order,
including:
1. air-supply duct in the external wall with cross-section
not lower than 50% of chimney cross-sectional area on
height maximum 1 m over the
fl
ooring or not lower than
200 cm
2
for boilers with power up to 25 kW or 400 cm
2
for boilers over 25 kW,
2. 2. separate air-exhaust duct on the internal wall with
cross-section not lower than 140x140 mm with an out-
let located under the boiler-room roof near the chimney.
NOTE! It is forbidden to use mechanical exhaust ventilation
in the room where the boiler was installed.
• Floor gully and
fl
oor with 1% slope towards the outlet
should be planned in the central part of the room.
• Flooring and walls in the whole room should be made of
non-combustible materials.
• The doors to the boiler room should open outwards.
3.1.1. Method for boiler setting
The boiler requires non-
fl
ammable
fl
ooring, in form of a foun-
dation, but it is allowed to place it on non-
fl
ammable wall base
with height not lower than 50 mm. The boiler should be placed
in a way ensuring free access to the equipment, allowing its
cleaning and maintenance. Therefore, while setting the boiler
it is recommended to maintain minimum distances from the
individual walls:
• distance from the front of the boiler to opposite boiler room
wall should not be smaller than 2 m,
• the distance of boiler side from the wall of the boiler room
should be lower than 1 m,
Summary of Contents for KSR Beta Pelet 16
Page 1: ...Operation and maintenance manual for KSR Beta Pelet series boilers with feeders ...
Page 20: ......
Page 21: ......
Page 23: ......
Page 25: ......
Page 26: ......
Page 54: ......
Page 55: ......
Page 56: ......
Page 57: ...1 ...
Page 58: ...2 ...
Page 72: ...16 ...
Page 73: ...17 ...
Page 74: ...18 ...
Page 75: ...19 ...
Page 76: ...20 ...
Page 77: ......
Page 78: ......
Page 90: ......
Page 91: ......
Page 92: ......
Page 93: ......
Page 94: ......
Page 98: ......
Page 99: ...USER MANUAL OF THE CONTROLLER S Control ...
Page 109: ...17 CONTROLLER INSTALLATION AND SERVICE SETTINGS S Control ...
Page 135: ...43 ...
Page 136: ......
Page 137: ...1 ...
Page 138: ......
Page 142: ......
Page 143: ...USER MANUAL OF THE CONTROLLER S Control TOUCH ...
Page 153: ...17 ...
Page 154: ......
Page 155: ...USER MANUAL OF CONTROLLER INSTALLATION AND SERVICE SETTINGS S Control TOUCH ...
Page 183: ......
Page 184: ......